Contractor · General building

FROSTY REFRIGERATION CO., INC

12 building permits since 2022 in Howard County, MD.

Building permits
12
Reported job value
—
Active
2022–2026
Latest permit
Oct 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Howard County, MD12

Permits by year

By issue date (application date where there is none).

036
6
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20222
20232
20241
20251
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC12
  • Remodels11
  • Additions11
  • Heat pumps6
  • Bathrooms4
  • Kitchens2
  • Gas1
  • Electrical1

Permit types

As the building departments classify them.

  • Residential HVAC Addition Alteration Permit11
  • Residential HVAC New Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 13, 2026Residential HVAC Addition Alteration PermitAdd supply and returns for basement alteration. Add bathroom exhaust ducting only. **NEED REVISED MANUAL J(NEED HVAC CONTRACTOR SIGNATURE ON MANUAL J)**Howard County—
Aug 14, 2026Residential HVAC Addition Alteration PermitReplacement of 3 ton heat pump system. **NEED MAKE AND MODEL OF EQUIPMENT**Howard County—
Aug 5, 2026Residential HVAC Addition Alteration PermitExtend supply ductwork for new addition. Replace and add new supply duct work. Three new supplies in the addition. floor register, no return ductwork, drier ducHoward County—
Mar 18, 2026Residential HVAC Addition Alteration PermitRelocating 2 supplies in basement and relocating 1 low return in basement.Howard County—
Mar 13, 2026Residential HVAC New PermitRelocating 2 supplies in basement and relocating 1 low return in basement.Howard County—
Feb 11, 2026Residential HVAC Addition Alteration PermitReplace (1) 5 ton 60K BTU packaged Geo-thermal heat pump, replace (2) 4 ton 48K BTU split Geo-thermal heat pumps, all same size and capacity. Replacement of exiHoward County—
Apr 8, 2025Residential HVAC Addition Alteration PermitSINGLE FAMILY DWELLING / INSTALL DUCTLESS MINI SPLITHoward County—
Sep 23, 2024Residential HVAC Addition Alteration PermitSINGLE FAMILY DWELLING / INSTALL DUCTLESS MINI SPLIT IN ADDITON / ENERGY METHOD = Prescriptive MethodHoward County—

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Cancelled1
  • Reviews in progress1
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.