Contractor · Windows, doors & glazing

Enrique Sanchez

12 building permits since 2025 in Providence city, RI; Woonsocket city, RI and Warwick city, RI, across 3 counties — $168,045 in reported job value over 11 permits that state one.

Building permits
12
Reported job value
$168K
Active
2025–2026
Latest permit
Jul 22, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI4
  • Woonsocket city, RI4
  • Warwick city, RI1
  • West Warwick town, RI1
  • Pawtucket city, RI1
  • North Kingstown town, RI1

Permits by year

By issue date (application date where there is none).

036
6
20252026*
* 2026 is year to date.
View as table
YearPermits
20256
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Windows & doors3
  • Roofing2
  • Remodels1
  • Demolition1

Permit types

As the building departments classify them.

  • Building Permit12

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 22, 2026Building PermitThe contractor will be building concrete wall with handrails around the homeowners property so the construction will be including cement concrete metal frames aPawtucket City$14,000
Jun 8, 2026Building PermitRepairing two floors of deck. Replacing and fixing rim joists and structural base of deck.Providence City$8,000
Apr 30, 2026Building PermitReplace damaged/failing foundation with a new CMU block foundation and lally columns to support the existing structure. Please s ee engineering plans in the perWoonsocket City$60,000
Apr 6, 2026Building Permitwe are just repairing a roof for a commercial propertyWarwick City$20,000
Mar 16, 2026Building PermitDemolition and repairing both 3 story decks .Woonsocket City$9,045
Feb 2, 2026Building Permitreplacing windows and doors in the building.West Warwick Town$15,000
Dec 1, 2025Building PermitAll we are doing is repairing the rim joist to the front deck and adding some stairs to the front door.Providence City$10,000
Dec 1, 2025Building PermitAdding new wood trim to roof ledge. It will be wood structure built on top of the front side of the building.Providence City$2,500

Permit status

Where its permits stand, as the departments report them.

  • Active9
  • Completed2
  • Stop work ordered1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.