Contractor · General building

ELLER WALT E & DOROTHY M TRUSTEES

12 building permits since 2012 in Santa Cruz County, CA.

Building permits
12
Reported job value
—
Active
2012–2018
Latest permit
Mar 7, 2018

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA12

Permits by year

By issue date (application date where there is none).

036
6
20122015201620172018
View as table
YearPermits
20126
20152
20161
20171
20182

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels6
  • Roofing3
  • Electrical2
  • Kitchens1
  • Plumbing1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Building12

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 7, 2018BuildingRemove existing Terracotta clay roof tiles on overhang and eves, install new sheathing if required, install cool roof compliant metal roofing (approx. 2,000 sq.Santa Cruz County—
Mar 7, 2018BuildingRemove existing Terracotta clay roof tiles on overhang and eves, install new sheathing if required, install cool roof compliant metal roofing (approx. 2,700 sq.Santa Cruz County—
Jul 19, 2017BuildingProposal to remodel exterior patio of existing restaurant (Suda) to include construction of 416 square foot shade structure, outdoor fire pit, patio heaters andSanta Cruz County—
Jul 13, 2016BuildingLRA, Central Fire Overlay class B 60 mil PVC or better (typ) roofing at an existing 4 unit commercial building. Install listed smoke detectors and carbon monoxiSanta Cruz County—
Oct 26, 2015BuildingChange Order to B-152729 to reframe/brace an exterior wall.Santa Cruz County—
Jul 9, 2015BuildingReplace restaurant exterior front overhang (North elevation). (Suda restaurant, 3910 Portola dr.)Santa Cruz County—
Sep 10, 2012BuildingStop Work SR# 12619 Tenant Improvement at an existing restaurant (Suda) to include recognize interior suspended trellis element over Bar area.Santa Cruz County—
Jun 6, 2012BuildingChange order to B-121265 (TI) to include install walk-in cooler and new fixtures at kitchen; revise electrical plugs, switches and ligthing; construct pass-thruSanta Cruz County—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.