Contractor · Specialty (solar, fire, telecom)

Dean Hodge

12 building permits since 2022 in Orleans Parish, LA and East Baton Rouge Parish, LA, across 2 counties.

Building permits
12
Reported job value
—
Active
2022–2023
Latest permit
Apr 4, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA11
  • East Baton Rouge Parish, LA1

Permits by year

By issue date (application date where there is none).

0510
9
20222023
View as table
YearPermits
20229
20233

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar12
  • Remodels5
  • Battery storage4
  • Electrical1

Permit types

As the building departments classify them.

  • Renovation (Structural)4
  • Renovation (Non-Structural)1
  • Solar Permit (R)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 4, 2023Renovation (Non-Structural)Solar PV roof mounted system and interconnection, this is related to building# B7YYZVOrleans Parish—
Mar 23, 2023—Electrical work for solar pv rooftop and interconnection system 2 Tesla Powerwalls for N7531ROrleans Parish—
Mar 20, 2023Renovation (Structural)solar pv rooftop and interconnection system 2 Tesla PowerwallsOrleans Parish—
Nov 15, 2022Solar Permit (R)Solar pv rooftop and interconnection systemEast Baton Rouge Parish—
Nov 15, 2022—Solar pv rooftop and interconnection system for reference # SQY0E1Orleans Parish—
Oct 21, 2022Renovation (Structural)Solar pv rooftop and interconnection systemOrleans Parish—
Oct 14, 2022—Planned outage - Entergy shuts off the power and we need to reconnect power back on the same day. It is related to our Solar permit 22-18235-SOLR and build permOrleans Parish—
Sep 8, 2022—Planned outage- Entergy shuts off the power, we need to reconnect the power back on the same day. It is related to Solar #22-18179-SOLR . Build Permit# 22 -1243Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Not stated6
  • Issued4
  • C/o issued2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.