Contractor · Electrical

Daniel Simoes

12 building permits since 2017 in East Greenwich town, RI; Providence city, RI and Warwick city, RI, across 3 counties — $31,700 in reported job value over 9 permits that state one.

Building permits
12
Reported job value
$31.7K
Active
2017–2025
Latest permit
Nov 4, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • East Greenwich town, RI3
  • Providence city, RI3
  • Warwick city, RI2
  • Coventry town, RI1
  • Exeter town, RI1
  • Narragansett town, RI1
  • North Kingstown town, RI1

Permits by year

By issue date (application date where there is none).

01.53
3
2019202120232025
View as table
YearPermits
20171
20191
20201
20211
20223
20231
20242
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical12
  • Electric meters5
  • Kitchens1
  • Remodels1

Permit types

As the building departments classify them.

  • Electrical Permit9
  • EG Electrical Permit3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 4, 2025Electrical Permitinstall100 amp temporary service,stantion,meter socket,weather tight panel,gfi's,ground rods etcCoventry Town$2,500
Jul 16, 2025Electrical PermitService revamp 200 amp overhead relocate service drop,install new meter socket with main disconnect,ground rods ,utility ground point,Rework existing electricalWarwick City$4,000
Sep 3, 2024Electrical PermitRemove and replace top section of meter socket damaged from loose jaw ,Remove existing meter damaged from loose connection point on meter guts. the scope of theProvidence City$5,000
Mar 26, 2024Electrical Permit—Exeter Town—
May 23, 2023Electrical PermitService Revamp to 200ampWarwick City$4,000
Jun 2, 2022Electrical PermitInstall 2 new circuit on arcfault breakers .Rough and finish electrical in 3 seasons rm.Providence City$2,500
Feb 17, 2022EG Electrical PermitService revamp from 100 to 200 overhead.East Greenwich Town$3,000
Feb 3, 2022Electrical Permit—Narragansett Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Active4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.