Contractor · Roofing
CULBERTSON COMP OF NY LTD
12 building permits since 2010 in New York County, NY — $2,752,400 in reported job value over 12 permits that state one.
- Building permits
- 12
- Reported job value
- $2.8M
- Active
- 2010–2011
- Latest permit
- Jan 31, 2011
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- New York County, NY12
Permits by year
By issue date (application date where there is none).
0510
10
20102011
View as tableHide table
| Year | Permits |
|---|---|
| 2010 | 10 |
| 2011 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Roofing2
Permit types
As the building departments classify them.
- OT12
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 31, 2011 | OT | FILING FOR GARAGE REPAIRS TO PATCH CONCRETE FLOOR STABS, CHIMNEY BRICK REPAIRS, CAP FLASHING AND RE-COAT ENTIRE ROOF SURFACE AS SHOWN ON DRAWINGS FILED HEREWITH | New York County | $315,000 |
| Jan 31, 2011 | OT | FILING FOR GARAGE REPAIRS TO PATCH CONCRETE FLOOR STABS, CHIMNEY BRICK REPAIRS, CAP FLASHING AND RE-COAT ENTIRE ROOF SURFACE AS SHOWN ON DRAWINGS FILED HEREWITH | New York County | $315,000 |
| Jul 14, 2010 | OT | FILING FOR THE INSTALL FABRICATED METAL WHEEL STOPS AND SECONDARY VEHICLE BARRIERS IN THE FORM OF FABRICATED BUMPER GUARD RAILING AT ELEVATED GARAGE FLOOR LEVEL | New York County | $365,000 |
| Jul 14, 2010 | OT | FILING FOR THE INSTALL FABRICATED METAL WHEEL STOPS AND SECONDARY VEHICLE BARRIERS IN THE FORM OF FABRICATED BUMPER GUARD RAILING AT ELEVATED GARAGE FLOOR LEVEL | New York County | $365,000 |
| May 12, 2010 | OT | FILING FOR THE INSTALL FABRICATED METAL WHEEL STOPS AND SECONDARY VEHICLE BARRIERS IN THE FORM OF FABRICATED BUMPER GUARD RAILING AT ELEVATED GARAGE FLOOR LEVEL | New York County | $365,000 |
| May 12, 2010 | OT | FILING FOR THE INSTALL FABRICATED METAL WHEEL STOPS AND SECONDARY VEHICLE BARRIERS IN THE FORM OF FABRICATED BUMPER GUARD RAILING AT ELEVATED GARAGE FLOOR LEVEL | New York County | $365,000 |
| Apr 2, 2010 | OT | REMOVE AND REPLACE THE STRUCTURAL CONCRETE SLAB IN THE AREA INDICATRD ON THE DRAWINGS,USING NEW HIGH STRENGTHCONCRETE WITH EXISTING STEEL REINFORCING BARS REMOV | New York County | $90,400 |
| Apr 2, 2010 | OT | REMOVE AND REPLACE THE STRUCTURAL CONCRETE SLAB IN THE AREA INDICATRD ON THE DRAWINGS,USING NEW HIGH STRENGTHCONCRETE WITH EXISTING STEEL REINFORCING BARS REMOV | New York County | $90,400 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.