Contractor · Electrical

Our World Energy

192 building permits since 2022 in Peoria city, AZ and Mesa city, AZ — $254,200 in reported job value over 43 permits that state one.

Building permits
192
Reported job value
$254.2K
Active
2022–2026
Latest permit
Aug 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Peoria city, AZ147
  • Mesa city, AZ45

Permits by year

By issue date (application date where there is none).

01020
20
2022202320242026*
* 2026 is year to date.
View as table
YearPermits
20221
202320
202410
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical45
  • Solar42
  • Electric meters35
  • Battery storage16
  • Kitchens2
  • EV chargers1

Permit types

As the building departments classify them.

  • Residential147
  • Electrical45

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 21, 2026ElectricalPERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF TWO TESLA POWERWALL 3 BATTERIES. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 7Mesa$24,500
Apr 29, 2026ElectricalPERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327Mesa$1,500
Apr 14, 2026ElectricalPERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE SOLAREDGE HOME BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PERMesa$15,100
Mar 24, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$18,650
Mar 24, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL3 BATTERY EXPANSION UNIT. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUMesa$18,650
Mar 23, 2026ElectricalPERMIT IS ONLY FOR AN UPGRADE TO A 225A SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4Mesa$16,800
Mar 23, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$15,500
Mar 23, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$15,500

Permit status

Where its permits stand, as the departments report them.

  • Finaled72
  • C/o issued40
  • Issued23
  • Expired21
  • Not stated14
  • Pending payment9
  • Reviews in progress6
  • Approved4

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.