Contractor · Specialty (solar, fire, telecom)
Brandon Cantelli
12 building permits since 2016 in Waltham city, MA; Boston city, MA and Falmouth town, MA, across 5 counties — $270,321 in reported job value over 9 permits that state one.
- Building permits
- 12
- Reported job value
- $270.3K
- Active
- 2016–2024
- Latest permit
- Apr 3, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Waltham city, MA3
- Boston city, MA3
- Falmouth town, MA2
- Somerville city, MA1
- Milton town, MA1
- Hingham town, MA1
- Middleborough town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 9 |
| 2017 | 2 |
| 2024 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar8
- Electrical1
Permit types
As the building departments classify them.
- RESI.3
- SOL3
- Solar Panels Residential3
- ELECT.1
- Residential Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 3, 2024 | Residential Permit | — | Middleborough Town | — |
| Mar 29, 2017 | — | to install a 5.025 kWh solar roof-mounted photovoltaic system, using 15 solar PV panels, with integrated microinverters DUPLICATE PERMIT B17-000475 | Somerville City | $26,482 |
| Jan 27, 2017 | Solar Panels Residential | INSTALL 22 SOLAR PANELS | Waltham City | $35,200 |
| Oct 27, 2016 | Solar Panels Residential | INSTALL 32 SOLAR PANELS | Waltham City | $41,992 |
| Oct 21, 2016 | ELECT. | install a roof mount 9.38 kw pv system | Falmouth Town | — |
| Oct 21, 2016 | RESI. | to install a 9.38 kwh dc roof mounted solar photovoltaic system, using 28 solar pv panels, with intergrated micro-inverters | Falmouth Town | — |
| Aug 3, 2016 | Solar Panels Residential | TO INSTALL A 6.21 KWH DC ROOF MOUNTED SOLAR PV SYSTEM. USING 18 SOLAR PV PANELS, WITH INTERGRATED MICRO-INVERTERS. | Waltham City | $34,582 |
| Aug 2, 2016 | RESI. | to install a 7.848 kwh dc roof mounted solar photovoltaic system, using 24 solar pv panels. no structural modifications required by engineer. | Milton Town | $44,876 |
Permit status
Where its permits stand, as the departments report them.
- Active3
- Not stated3
- Closed2
- Issued2
- Finaled1
- Withdrawn1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.