Contractor · Electrical
BEST BUY STORES LP
12 building permits since 2025 in Richmond city, VA; Arlington County, VA and Amherst County, VA, across 4 counties — $2,500 in reported job value over 1 permits that state one.
- Building permits
- 12
- Reported job value
- $2.5K
- Active
- 2025–2026
- Latest permit
- Jun 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Richmond city, VA6
- Arlington County, VA4
- Amherst County, VA1
- Henry County, VA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 1 |
| 2026 (YTD) | 11 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical11
- Remodels1
- Roofing1
Permit types
As the building departments classify them.
- ELEC PRMT (Commercal) - Repair or Replace5
- Electrical4
- ELEC - ELECTRICAL1
- ELEC PRMT (Commercial) - Light Alteration or Remodel1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 15, 2026 | Electrical | Installing a 5G WiFi Cradleppoint on the building with 2 data lines and a ground wire ran to it, upgrading the building’s WiFi equipment | Arlington County | — |
| Jun 8, 2026 | Electrical | Installing a 5G WiFi Cradleppoint on the building with 2 data lines and a ground wire ran to it, upgrading the building’s WiFi equipment | Arlington County | — |
| May 27, 2026 | ELEC PRMT (Commercal) - Repair or Replace | Installing a 5G WiFi Cradleppoint on the building with 2 data lines and a ground wire ran to it, upgrading the building’s WiFi equipment | Richmond City | — |
| May 27, 2026 | ELEC PRMT (Commercal) - Repair or Replace | Installing a 5G WiFi Cradleppoint on the building with 2 data lines and a ground wire ran to it, upgrading the building’s WiFi equipment | Richmond City | — |
| May 27, 2026 | ELEC PRMT (Commercal) - Repair or Replace | Installing a 5G WiFi Cradleppoint on the building with 2 data lines and a ground wire ran to it, upgrading the building’s WiFi equipment | Richmond City | — |
| May 27, 2026 | ELEC PRMT (Commercal) - Repair or Replace | Installing a 5G WiFi Cradleppoint on the building with 2 data lines and a ground wire ran to it, upgrading the building’s WiFi equipment | Richmond City | — |
| May 26, 2026 | ELEC PRMT (Commercal) - Repair or Replace | Installing a 5G WiFi Cradleppoint on the building with 2 data lines and a ground wire ran to it, upgrading the building’s WiFi equipment. issued OTC. | Richmond City | — |
| Mar 19, 2026 | ELEC PRMT (Commercial) - Light Alteration or Remodel | Installing a 5G WiFi Cradle Point It will be mounted inside near the equipment rack 2 data lines and ground wire ran to it, installing 1 POE and 2 in-line surge | Richmond City | — |
Permit status
Where its permits stand, as the departments report them.
- Issued7
- Pending3
- Closed1
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.