Contractor · Electrical

ASTRAL ELECTRIC

12 building permits since 2018 in Lodi city, CA; Sacramento County, CA and Sacramento city, CA, across 2 counties — $71,183 in reported job value over 12 permits that state one.

Building permits
12
Reported job value
$71.2K
Active
2018–2026
Latest permit
Sep 17, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Lodi city, CA4
  • Sacramento County, CA3
  • Sacramento city, CA3
  • Elk Grove city, CA2

Permits by year

By issue date (application date where there is none).

02.55
5
20182019202220252026*
* 2026 is year to date.
View as table
YearPermits
20182
20193
20221
20251
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical10
  • Electric meters4
  • HVAC1
  • Remodels1
  • Additions1
  • Plumbing1
  • EV chargers1

Permit types

As the building departments classify them.

  • Single Family3
  • ELECTRICAL2
  • EQUIPMENT ELECTRICAL2
  • MISR2
  • COMMERCIAL ADDITION ALTERATION REPAIR1
  • EQUIPMENT EV1
  • PANR1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 17, 2026EQUIPMENT EVInstall EV Meter & ChargerLodi$2,200
May 12, 2026PANRElectrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Remove and replaceSacramento County$8,000
Mar 31, 2026COMMERCIAL ADDITION ALTERATION REPAIRCostco - Install (1) industrial fan over produce departmentLodi$16,000
Mar 4, 2026EQUIPMENT ELECTRICALBldg A - Replace 400amp MSP & 8 metersLodi$15,000
Mar 4, 2026EQUIPMENT ELECTRICALBldg B - Replace 400amp MSP & 9 metersLodi$15,000
May 6, 2025MISRRemove and replace existing 200AMP Meter Service panel to 325AMP. Install new meter panel on adjacent building as confirmed with SMUD.Sacramento County$4,200
May 11, 2022MISRUpgrade existing main electrical service to new 200 AMPSacramento County$2,200
Sep 4, 2019ELECTRICALC/O PANEL 100 AMPElk Grove City$1,200

Permit status

Where its permits stand, as the departments report them.

  • Issued5
  • Finaled3
  • Closed2
  • Completed2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.