Contractor · General building

ANDREWS LINDA S

12 building permits since 2015 in Santa Cruz County, CA.

Building permits
12
Reported job value
—
Active
2015–2025
Latest permit
Sep 16, 2025

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA12

Permits by year

By issue date (application date where there is none).

024
4
2015201720212025
View as table
YearPermits
20153
20174
20213
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical3
  • Remodels2
  • Roofing2
  • Bathrooms2
  • Battery storage1
  • Grading & excavation1
  • Kitchens1
  • Additions1
  • Plumbing1

Permit types

As the building departments classify them.

  • Building12

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 16, 2025BuildingConstruction Change Document #1 to Permit B-244177 to include the following. Emergency change order request to replace existing foundation, rather than underpinSanta Cruz County—
Apr 30, 2025BuildingAddition and remodel to existing SFD to include 632 SF second story addition to add a (2) bedrooms and a bathroom. Permit to include remodel of 154 SF of the fiSanta Cruz County—
Nov 3, 2021BuildingInstall new/replacement wall heater (like for like) with associated venting at an existing Single Family Dwelling. Install listed smoke detectors and carbon monSanta Cruz County—
Apr 27, 2021BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a (13.5)kWh, (1) battery energy storage system Santa Cruz County—
Feb 8, 2021BuildingZayante FPD/SRA Mod Reconnect PG&E lines disconnected by falling tree branch for 160 McEnery Road. No new equipment installed. Install listed smoke detectors anSanta Cruz County—
Jun 12, 2017BuildingZayante Fire Agency - SRA = mod Replace electric service panel with new 200AMP service panel at an existing single family dwelling to be relocated from the dwelSanta Cruz County—
Mar 27, 2017BuildingOverlay existing roof with comp shingles and overlay the flat section with Duro-last, class B or better on an existing SFD. Install listed smoke and carbon monoSanta Cruz County—
Mar 27, 2017BuildingOverlay existing roof with comp shingles and overlay the flat section with Duro-last, class B or better on an existing garage. Install listed smoke and carbon mSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed11
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.