Contractor · General building

ALVAREZ MANUEL & ALICIA R H/W JT

12 building permits since 1996 in Santa Cruz County, CA.

Building permits
12
Reported job value
—
Active
1996–2006
Latest permit
Jan 5, 2006

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA12

Permits by year

By issue date (application date where there is none).

01.53
3
1997199920022006
View as table
YearPermits
19961
19971
19981
19992
20002
20023
20051
20061

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing6
  • Electrical6
  • Roofing4
  • Additions4
  • Bathrooms4
  • Gas1

Permit types

As the building departments classify them.

  • Building12

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 5, 2006BuildingReframe and reroof existing Unit A (conforming unit) to include submit engineered roof truss calcs. at existing 2 unit dwelling group, Unit A and Unit B attacheSanta Cruz County—
Mar 14, 2005BuildingReplace electric service panel at an existing SFD with new 100A service panel. On site with vegie farm.Santa Cruz County—
Nov 1, 2002Building1. Rectify Red-Tag: Recognize shower, toilet, plumbing lines and modified electrical in an existing barn on commercial agriculture zoned land used for row cropsSanta Cruz County—
Nov 1, 2002BuildingTear off roofing and install new sheathing as required and class B or better comp. shingle roofing at an existing SFD. Other repair work to include replace elecSanta Cruz County—
Oct 4, 2002Building1. Rectify Red-Tag: Recognize shower, toilet, plumbing lines and modified electrical in an existing barn on commercial agriculture zoned land used for row cropsSanta Cruz County—
Jun 6, 2000BuildingSpecial inspection to determine if a residence located at 5300 Royal Oak, Prunedale, (in front of Royal Oak Park) meets code requirements to be moved.(Building Santa Cruz County—
Feb 18, 2000BuildingReplace gas piping for a duplex.Santa Cruz County—
Feb 3, 1999BuildingRECTIFY RED-TAG RECOGNIZE AS BUILT CONSTRUCTION OF: ROOM ADDITION TO AN EXISTING 1 STORY SFD TO INCLUDE CONSTRUCTING A LIVING ROOM AND A BATHROOM. RESULTS IN A Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed11
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.