Contractor · General building
AIELLO ANTHONY JOSEPH & LAURA ANN TRUSTEES
12 building permits since 2007 in Santa Cruz County, CA.
- Building permits
- 12
- Reported job value
- —
- Active
- 2007–2026
- Latest permit
- Jun 11, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA12
Permits by year
By issue date (application date where there is none).
01.53
3
2007201520172026*
View as tableHide table
| Year | Permits |
|---|---|
| 2007 | 1 |
| 2009 | 3 |
| 2015 | 1 |
| 2016 | 1 |
| 2017 | 1 |
| 2025 | 2 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels3
- Bathrooms3
- Windows & doors3
- Gas1
- Solar1
- Roofing1
- Additions1
- Plumbing1
- Electrical1
Permit types
As the building departments classify them.
- Building12
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 11, 2026 | Building | Construction Change Document #1 to Permit B-243420 to include following: Installed an additional Intellijack on poly foot pad to help re-level SFD. | Santa Cruz County | — |
| May 28, 2026 | Building | Extension #2 granted to permit B-243420 to 11/27/2026 - TG | Santa Cruz County | — |
| Mar 10, 2026 | Building | Siding permit to replace approx. 40 ' of exterior wood siding with new stucco at left side of SFD. NOTE: For stucco applications, Santa Cruz County is a marine | Santa Cruz County | — |
| Aug 26, 2025 | Building | Remodel to existing SFD to include remodel of 182 SF including the hallway bathroom, a 1/2 bathroom and laundry room. Replace front door "in-kind". Permit to re | Santa Cruz County | — |
| Apr 16, 2025 | Building | Foundation repair using 10 helical piers, 1 push pier and 14 screw jacks at existing SFD. Install listed smoke detectors and carbon monoxide alarms or combinati | Santa Cruz County | — |
| Mar 20, 2017 | Building | Extended permit #b-154595 from 10/15/16 to 4/15/17. LRA Interior master-bath remodel at an existing 1-story SFD to include relocate fixtures and add exterior do | Santa Cruz County | — |
| May 31, 2016 | Building | EL: Install a roof mounted photovoltaic electrical system not to exceed 32 feet in height on a single family dwelling. The Building Inspector may require roof s | Santa Cruz County | — |
| Oct 15, 2015 | Building | Permit extended from 10/15/16 to 4/15/17 LRA Interior master-bath remodel at an existing 1-story SFD to include relocate fixtures and add exterior door. Inspect | Santa Cruz County | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.