Contractor
85 brick kiln llc
12 building permits since 2026 in Falmouth town, MA.
- Building permits
- 12
- Reported job value
- —
- Active
- 2026
- Latest permit
- Mar 20, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Falmouth town, MA12
Permit types
As the building departments classify them.
- RESI.12
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 20, 2026 | RESI. | 10 unit 2-story studio apartment building. slab on grade 10 units. five on each floor. each unit being 512 square feet. front and rear porches with egress stair | Falmouth Town | — |
| Mar 9, 2026 | RESI. | revise detail of demising wall from 2x4 double wall with5/8 board on both sides to shaft wall construction with 2x4 double wall with 1" air pace and shaft wall | Falmouth Town | — |
| Mar 9, 2026 | RESI. | revise detail of demising wall from 2x4 double wall with5/8 board on both sides to shaft wall construction with 2x4 double wall with 1" air pace and shaft wall | Falmouth Town | — |
| Mar 9, 2026 | RESI. | revise detail of demising wall from 2x4 double wall with5/8 board on both sides to shaft wall construction with 2x4 double wall with 1" air pace and shaft wall | Falmouth Town | — |
| Mar 9, 2026 | RESI. | revise detail of demising wall from 2x4 double wall with5/8 board on both sides to shaft wall construction with 2x4 double wall with 1" air pace and shaft wall | Falmouth Town | — |
| Mar 9, 2026 | RESI. | 12 unit 2-story studio apartment building. slab on grade 12 units. six on each floor. each unit being 512 square feet. front and rear porches with egress stairs | Falmouth Town | — |
| Mar 9, 2026 | RESI. | revise detail of demising wall from 2x4 double wall with5/8 board on both sides to shaft wall construction with 2x4 double wall with 1" air pace and shaft wall | Falmouth Town | — |
| Mar 9, 2026 | RESI. | revise detail of demising wall from 2x4 double wall with5/8 board on both sides to shaft wall construction with 2x4 double wall with 1" air pace and shaft wall | Falmouth Town | — |
Permit status
Where its permits stand, as the departments report them.
- Additional information required10
- Issued2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.