Contractor · General building
Rouben Balagian
195 building permits since 2017 in Providence city, RI; Warwick city, RI and Cranston city, RI, across 5 counties — $11,895,416 in reported job value over 185 permits that state one.
- Building permits
- 195
- Reported job value
- $11.9M
- Active
- 2017–2026
- Latest permit
- Oct 21, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Providence city, RI70
- Warwick city, RI27
- Cranston city, RI19
- West Warwick town, RI14
- Pawtucket city, RI11
- East Greenwich town, RI10
- Cumberland town, RI8
- East Providence city, RI8
- Barrington town, RI4
- Smithfield town, RI3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 2 |
| 2018 | 5 |
| 2019 | 5 |
| 2020 | 10 |
| 2021 | 11 |
| 2022 | 23 |
| 2023 | 16 |
| 2024 | 26 |
| 2025 | 45 |
| 2026 (YTD) | 52 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Windows & doors59
- Bathrooms51
- Remodels50
- Demolition48
- Roofing41
- Kitchens35
- Additions20
- Plumbing20
- New construction12
- Electrical10
Permit types
As the building departments classify them.
- Building Permit146
- 1) Building Permit19
- EG Building Permit10
- Roofing Permit6
- Demolition Permit4
- Raze Building Permit4
- Siding Permit2
- Deck Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 21, 2026 | Building Permit | Remove existing kitchen cabinets & countertops. Selective removal of base and case molding within the kitchen area. Install new kitchen cabinetry & countertops. | Pawtucket City | $18,950 |
| Oct 20, 2026 | Building Permit | Interior alteration of existing residential kitchen and bathroom areas . Work includes selective demolition of existing wall finishes, gypsum board, interior do | East Providence City | $76,908 |
| Oct 15, 2026 | 1) Building Permit | Work includes selective demolition and selective floor framing to facilitate new construction . Structural scope comprises the installation of poured concrete p | Cranston City | $53,778 |
| Oct 13, 2026 | Building Permit | Interior and exterior alteration of an existing single-family residence, including a second-story shed dormer addition . Structural work involves the framing of | East Providence City | $76,977 |
| Oct 3, 2026 | Building Permit | For interior and exterior alterations to a three-story, single-family dwelling. Work to include: Installation of engineered Lally columns, PSL posts, LVL beams, | Providence City | $178,795 |
| Sep 28, 2026 | Building Permit | Residential alteration of an existing kitchen and the construction of a new exterior attached deck . Demolition work consists of the removal of an aluminum sunr | Smithfield Town | $65,985 |
| Sep 26, 2026 | Building Permit | Interior alterations involve the demolition of existing wall finishes and the installation of a new 6" galvanized steel stud wall framing system with mineral wo | Providence City | $18,121 |
| Sep 22, 2026 | Building Permit | Selective interior demolition (as part of fire restoration) across a three-story, single-family dwelling. Scope includes the removal of fire-damaged interior wa | Providence City | $8,487 |
Permit status
Where its permits stand, as the departments report them.
- Active119
- Completed67
- Stop work ordered9
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.