Contractor · Electrical
NATIONAL ENERGY INSTALLERS LLC
195 building permits since 2023 in Los Angeles city, CA; San Diego County, CA and Riverside city, CA, across 4 counties — $296,750 in reported job value over 7 permits that state one.
- Building permits
- 195
- Reported job value
- $296.8K
- Active
- 2023–2026
- Latest permit
- Mar 17, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA172
- San Diego County, CA10
- Riverside city, CA6
- Norwalk city, CA2
- Oceanside city, CA2
- Vista city, CA2
- Garden Grove city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 194 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical181
- Solar19
- Battery storage5
- Roofing4
- Electric meters2
Permit types
As the building departments classify them.
- Electrical172
- Residential6
- Building Misc - Photovoltaic System (PV)2
- Solar Panel2
- SFD SOLAR PV - ENERGY STORAGE SYSTEM1
- SFD SOLAR PV - SIMPLE1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 17, 2026 | — | INSTALL (N) ROOF MOUNTED PVS 87.750KW, (150) PANELS, AND 122.88KWH ENERGY STORAGE SYS FOR GARDEN GROVE UNITED METHODIST CHURCH. OCFA SR 26000494 | Garden Grove City | $220,000 |
| Dec 19, 2023 | Residential | UPGRADE ELECTRIC SERVICE (METER) PANEL TO 200 AMPS | Riverside City | $2,000 |
| Nov 30, 2023 | Residential | INSTALL PV SYSTEM WITH 18 PANELS AND 7.20 KW ON RESIDENTIAL ROOF | Riverside City | $11,955 |
| Nov 30, 2023 | — | HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV WITH ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does n | San Diego County | — |
| Nov 17, 2023 | — | 200 AMP UPGRADE FOR EXISTING SFD, MISC ELECTRICAL. | San Diego County | — |
| Nov 8, 2023 | Residential | INSTALL PV SYSTEM WITH 34 PANELS AND 13.60 KW ON RESIDENTIAL ROOF **PANEL UPGRADE BY SEPARATE SUBMITTAL** | Riverside City | $40,800 |
| Oct 31, 2023 | SFD SOLAR PV - ENERGY STORAGE SYSTEM | 17 panels, 9 micro inverters,3 ESS Batteries | Oceanside City | — |
| Oct 5, 2023 | — | Existing Residential Main Electrical Service Upgrade - 400A - (Online Permit) *The scope of work is limited to upgrade of the existing main service panel. No ne | San Diego County | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated172
- Finaled7
- Issued6
- Completed6
- Active4
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.