Contractor · Plumbing
Jose Gonzalez
195 building permits since 2012 in Orleans Parish, LA and East Baton Rouge Parish, LA, across 2 counties — $15,000 in reported job value over 1 permits that state one.
- Building permits
- 195
- Reported job value
- $15K
- Active
- 2012–2026
- Latest permit
- May 22, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Orleans Parish, LA193
- East Baton Rouge Parish, LA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2012 | 7 |
| 2013 | 20 |
| 2014 | 24 |
| 2015 | 18 |
| 2016 | 51 |
| 2017 | 39 |
| 2018 | 10 |
| 2019 | 3 |
| 2020 | 4 |
| 2021 | 10 |
| 2022 | 3 |
| 2023 | 4 |
| 2024 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical73
- HVAC72
- Gas54
- Plumbing42
- Water heaters33
- Heat pumps7
- Remodels6
- Electric meters3
- Kitchens1
- Roofing1
Permit types
As the building departments classify them.
- Renovation (Non-Structural)3
- Existing Bldg - Addition Only (R)1
- Occupancy Permit (R)1
- Renovation (Structural)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 22, 2026 | Existing Bldg - Addition Only (R) | (EXPEDITED) Extension of garage, for multiples proposed such as Storage of home goods, time share with family and friends | East Baton Rouge Parish | $15,000 |
| Mar 4, 2024 | — | Installation of a one and a half ton mini split system | Orleans Parish | — |
| Mar 7, 2023 | — | Installation of a 2 ton multi zone mini split system | Orleans Parish | — |
| Feb 7, 2023 | — | Installations of two 2 ton air conditioning systems with electrical heat | Orleans Parish | — |
| Feb 3, 2023 | — | Installation of 2 to 2 ton electric heat air-conditioning systems. | Orleans Parish | — |
| Jan 31, 2023 | — | Installations of 2 two ton air conditioning systems with electrical heat | Orleans Parish | — |
| Jul 25, 2022 | — | Installation of a 4 ton mini split system and a 3 ton mini split system with two air handlers | Orleans Parish | — |
| Jul 1, 2022 | — | Installation of a 3 ton mini split system with a ducted unit and a wall mount unit | Orleans Parish | — |
Permit status
Where its permits stand, as the departments report them.
- C/o issued170
- Issued20
- Not stated3
- Expired1
- Finaled1
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.