Contractor · General building
V & S QUALITY CONSTRUCTION INC
13 building permits since 2021 in Sacramento County, CA and Sacramento city, CA — $500,106 in reported job value over 13 permits that state one.
- Building permits
- 13
- Reported job value
- $500.1K
- Active
- 2021–2026
- Latest permit
- Jul 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA7
- Sacramento city, CA6
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 1 |
| 2022 | 2 |
| 2024 | 7 |
| 2025 | 1 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms8
- Plumbing8
- Electrical6
- Remodels5
- Kitchens4
- HVAC3
- Windows & doors2
- Demolition1
- Electric meters1
Permit types
As the building departments classify them.
- Single Family6
- CBAR4
- CBRC1
- CBRR1
- MISC1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 29, 2026 | MISC | Replace existing Zinsco 100A subpanels with new 100A Square D subpanels in Units 1, 2, and 3 at 4149 Apostolo Cir, Sacramento, CA 95824. Existing electrical met | Sacramento County | $13,025 |
| Feb 10, 2026 | CBAR | Bathroom remodel: remove and replace existing shower finishes and tile; install new waterproofing and tile; replace shower mixing valve and trim; replace existi | Sacramento County | $13,025 |
| May 29, 2025 | CBRR | We will remove siding ourselves. Contractor will replace with stucco. | Sacramento County | $25,000 |
| Dec 9, 2024 | CBRC | 1 floor install new tub and acrylic panel around tub, instal mixer valve replace exhaust fan , new toilet,drywall on wall patching and paint. Second floor: in | Sacramento County | $35,185 |
| Nov 7, 2024 | Single Family | EPC - Relocation all plumbing according, new proposal plan, install new exhaust, fan Install new recessed ceiling light, provide new dedication electrical line | Sacramento | $50,450 |
| Oct 25, 2024 | CBAR | REMOVE BATHTUB AND MAKE WALKING SHOWER ON SAME PLACE ,REPLACE MIXER VALVE,REPLACE VANITY INSTALL NEW LIGHTING FIXTURES, INSTAL TOILET , PAINT. | Sacramento County | $29,536 |
| May 1, 2024 | Single Family | EPC - Remodel kitchen and bathrooms. Replace kitchen cabinet install new recessed lights, Remodel master bathroom, relocated tub for master bathroom install ne | Sacramento | $150,365 |
| Mar 28, 2024 | Single Family | EPC - Convert 180 sq ft existing garage into livable per proposed layout. New bath in the converted area. New electrical, new doors and window, provide server l | Sacramento | $30,200 |
Permit status
Where its permits stand, as the departments report them.
- Issued6
- Completed4
- Finaled3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.