Contractor · Plumbing
THE PLUMBING CONNECTION OF SOUTH WEST FLORIDA
13 building permits since 2007 in Sarasota city, FL — $21,730 in reported job value over 13 permits that state one.
- Building permits
- 13
- Reported job value
- $21.7K
- Active
- 2007–2019
- Latest permit
- Feb 5, 2019
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sarasota city, FL13
Permits by year
By issue date (application date where there is none).
024
4
2007201120142019
View as tableHide table
| Year | Permits |
|---|---|
| 2007 | 2 |
| 2010 | 1 |
| 2011 | 1 |
| 2012 | 4 |
| 2014 | 2 |
| 2015 | 2 |
| 2019 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing13
- Bathrooms4
- Kitchens3
- Gas2
- Water heaters2
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Building and Zoning13
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 5, 2019 | Building and Zoning | ADD WASHING MACHINE PLUMBING TO 2ND FLOOR, 2ND FLOOR BATHROOM - TUB TO SHOWER AND REPLACE TOILET AND TWO LAVRATORIES | Sarasota City | $2,200 |
| Sep 10, 2015 | Building and Zoning | PROVIDE AND INSTALL (3/4”) RPZ BACKFLOW ON PRIVATE PROPERTY. INSTALL A FAKE ROCK OVER THE BFP | Sarasota City | $500 |
| Jan 29, 2015 | Building and Zoning | INSTALL (3/4") RPZ BACKFLOW PREVENTOR | Sarasota City | $600 |
| Sep 8, 2014 | Building and Zoning | REPLACE SEWER LINE FROM MAIN HOUSE TO CITY SEWER TAP W/PVC PIPE AND FITTINGS | Sarasota City | $800 |
| Mar 25, 2014 | Building and Zoning | REPLACE EXISTING SEWER LINE W/ PVC PIPE AND FITTINGS | Sarasota City | $1,800 |
| Jul 30, 2012 | Building and Zoning | RE-PIPE POTABLE WATER SYSTEM W/ 1/" & 3/4" CPVC PIPE AND FITTINGS 2 BATHROOM, 1 KITCHEN, 1 WASHER OVERHEAD PIPING HOT AND COLD COMPLETE. | Sarasota City | $2,400 |
| Mar 26, 2012 | Building and Zoning | REPLACE DRAINAGE SYSTEM FOR FOR 2 BATHROOMS , 2 KITCHENS, SINK, 2 WASHER, W/ PVC PIPING. 3 INCH & 2 INCH.(2 PHASES) UNIT 896 & UNIT 898. | Sarasota City | $2,200 |
| Jan 4, 2012 | Building and Zoning | REPLACE SEWER LINE | Sarasota City | $1,800 |
Permit status
Where its permits stand, as the departments report them.
- Closed11
- Withdrawn2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.