Contractor · HVAC

Tech-On-Deck Heating, Air & Electrical (dba)

13 building permits since 2020 in Butner town, NC; Brassfield township, NC and Tally Ho township, NC.

Building permits
13
Reported job value
—
Active
2020–2026
Latest permit
Jun 9, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Butner town, NC4
  • Brassfield township, NC3
  • Tally Ho township, NC3
  • Oak Hill township, NC1
  • Salem township, NC1
  • Creedmoor city, NC1

Permits by year

By issue date (application date where there is none).

02.55
5
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20201
20211
20221
20232
20241
20255
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC9
  • Heat pumps7
  • Electrical4
  • Gas2
  • Additions1
  • Plumbing1
  • Generators1
  • Electric meters1

Permit types

As the building departments classify them.

  • MC-Change Out Unit9
  • EL-Other2
  • EL-Res. Change of Service1
  • MC-Other1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 9, 2026EL-Res. Change of ServiceEmergency New Outdoor 200 amp panel leaving existing meter baseTally Ho township—
Mar 24, 2026MC-Change Out UnitHVAC Change out: Replace split heat pump located in closet and side of homeButner town—
Nov 12, 2025MC-Change Out UnitReplace split heat pump system in attic and side of homeBrassfield township—
Oct 13, 2025EL-Otherreplace 200 amp indoor panelOak Hill township—
Aug 26, 2025MC-Change Out UnitHVAC Change out: Replace Heat pump around back and Air handler in closetSalem township—
Mar 26, 2025MC-Change Out UnitReplace furnace coil condenser located in attic and on left side of homeButner town—
Feb 4, 2025MC-Change Out Unitreplace downstairs heat pump in crawlspace and left side of homeTally Ho township—
Nov 5, 2024MC-Change Out Unitreplace downstairs split heat pump in crawlspace and on side of homeTally Ho township—

Permit status

Where its permits stand, as the departments report them.

  • Completed10
  • Expired3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.