Contractor · Electrical

steven m dion

13 building permits since 2009 in Taunton city, MA; Lexington town, MA and Attleboro city, MA, across 5 counties — $85,000 in reported job value over 7 permits that state one.

Building permits
13
Reported job value
$85K
Active
2009–2020
Latest permit
Apr 10, 2020

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Taunton city, MA3
  • Lexington town, MA3
  • Attleboro city, MA2
  • Ipswich town, MA2
  • North Attleborough Town city, MA1
  • Canton town, MA1
  • Bridgewater Town city, MA1

Permits by year

By issue date (application date where there is none).

01.53
3
2009201620182020
View as table
YearPermits
20091
20152
20161
20172
20181
20193
20203

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical13
  • HVAC5
  • Roofing1

Permit types

As the building departments classify them.

  • ELECT.8
  • Electrical3
  • Electrical Permit2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 10, 2020ELECT.Disconnect and make safe of (4) Existing Roof Top Units and reconnect (4) New Roof Top Units. (Low Voltage)Bridgewater Town City$10,000
Jan 31, 2020Electrical Permit—North Attleborough Town City—
Jan 14, 2020ELECT.low voltage and power wiring tp (1) split system with (2) indoor evaporators and (1) roof mount condensorTaunton City—
Dec 31, 2019ELECT.low voltage and power wiring tp 1 split system with 2 indoor evaporators and 1 roof mount condensorTaunton City—
Oct 17, 2019ELECT.installation of hvac control wiring for 2 new unit heaters.Taunton City—
Aug 7, 2019ELECT.low voltage control wiring for (4) condensing units, (37) evaporators and 37 exhaust fans located on the 1st,2nd and 3rd floorIpswich Town$29,000
Dec 20, 2018ELECT.Retro fit lighting to LED and rework and existing switches and outlets. Disconnect and reconnect existing HVAC equipment to be replaced with new . Location: BasIpswich Town$15,000
Dec 14, 2017ELECT.—Attleboro City—

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Issued2
  • Finaled2
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.