Contractor · Specialty (solar, fire, telecom)
SOLARHUT LLC
13 building permits since 2012 in Sacramento County, CA; Sacramento city, CA and Elk Grove city, CA, across 5 counties — $275,805 in reported job value over 11 permits that state one.
- Building permits
- 13
- Reported job value
- $275.8K
- Active
- 2012–2026
- Latest permit
- Mar 9, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA4
- Sacramento city, CA3
- Elk Grove city, CA2
- Marin County, CA1
- San Diego County, CA1
- Santa Clara County, CA1
- Capitola city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2012 | 1 |
| 2015 | 1 |
| 2021 | 2 |
| 2022 | 4 |
| 2023 | 1 |
| 2025 | 3 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar11
- Electrical5
- Roofing3
- Plumbing2
- EV chargers2
- Water heaters2
- Battery storage1
- Electric meters1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- MISR3
- ELECTRICAL2
- Single Family2
- B-Residential1
- Electrical1
- Existing1
- MISC1
- RESIDENTIAL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 9, 2026 | Electrical | Pv solar roof mount refer to dev25-2104 for ess | Santa Clara County | — |
| Nov 24, 2025 | MISR | Remove & Reinstall solar system for new roof. 2.62Kw DC. 6.0Kw AC 10 modules New TPO Roofing | Sacramento County | $4,500 |
| Oct 24, 2025 | Single Family | Install 11.5Kw EV charger (Tesla Universal Wall Connector) with Dynamic Power Management (PCS) | Sacramento | $1,400 |
| Sep 17, 2025 | Solar System | Reviewed by SolarApp+ 4kw Solar PV System, 13.5 kw PV Storage System Size and nullgal Solar WH System (water heater installed null). | Sacramento | $33,250 |
| Oct 16, 2023 | Single Family | 7.48kw Solar PV System, and 0gal Solar WH System (water heater installed null) & 13kW Battery & EV Charger. All supply side connections, main breaker change-out | Sacramento | $54,330 |
| Jul 12, 2022 | MISR | Adding a 4.25KW grid tied solar array | Sacramento County | $18,058 |
| May 17, 2022 | ELECTRICAL | ROOF MOUNT 9.35 KW PV SOLAR SYSTEM | Elk Grove City | $37,999 |
| Apr 5, 2022 | RESIDENTIAL | Home has Existing Solar PV (previous PV permit 166112. ADDING 18 panels (6.03kWDC)and 1 Inverter as follows: 12 Panels will be on main dwelling roof. 6 Panels w | Marin County | $17,848 |
Permit status
Where its permits stand, as the departments report them.
- Issued4
- Completed4
- Closed2
- Active1
- Finaled1
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.