Contractor · Electrical

Scott Wahlstrom

13 building permits since 2025 in Mesa city, AZ and Peoria city, AZ — $308,070 in reported job value over 10 permits that state one.

Building permits
13
Reported job value
$308.1K
Active
2025–2026
Latest permit
Aug 18, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ11
  • Peoria city, AZ2

Permits by year

By issue date (application date where there is none).

02.55
5
20252026*
* 2026 is year to date.
View as table
YearPermits
20255
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • Solar10
  • Battery storage10
  • Electric meters10

Permit types

As the building departments classify them.

  • Electrical11
  • Residential2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 18, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$18,788
Aug 14, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$28,650
May 19, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$33,000
Apr 23, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMEDMesa$32,000
Feb 9, 2026ElectricalPERMIT IS ONLY FOR UPGRADE TO A 200A SERVICE AND INSTALLATION OF THREE ENPHASE BATTERIES. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALLMesa$60,560
Nov 24, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL 3 EXPANSION UNIT. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S IMesa$42,000
Oct 8, 2025Electrical“Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DMesa$3,500
Aug 28, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$29,900

Permit status

Where its permits stand, as the departments report them.

  • C/o issued10
  • Finaled2
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.