Contractor · Electrical

SCOTT MERCER LLC

13 building permits since 2022 in Howard County, MD and Rockville city, MD, across 2 counties.

Building permits
13
Reported job value
—
Active
2022–2025
Latest permit
Oct 22, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Howard County, MD12
  • Rockville city, MD1

Permits by year

By issue date (application date where there is none).

02.55
5
2022202320242025
View as table
YearPermits
20221
20234
20245
20253

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical13
  • Pools & hot tubs8
  • HVAC4
  • Remodels3
  • Additions3
  • Bathrooms1
  • Heat pumps1

Permit types

As the building departments classify them.

  • Residential Electrical Miscellaneous Permit8
  • Residential Electrical Addition Alteration Permit3
  • Commercial Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 22, 2025Residential Electrical Miscellaneous PermitWiring and bonding for new in ground swimming pool with heat pump B2500339Howard County—
Aug 1, 2025Residential Electrical Miscellaneous PermitWiring and bonding for in ground swimming pool B25002265Howard County—
Jul 11, 2025Residential Electrical Addition Alteration PermitWiring for pool house with bathroom; 100 amp underground feed; Bb heater in bathroom; Lights, ceiling fans, switches, receptacles; Total of (50) devicesHoward County—
Dec 23, 2024Residential Electrical Miscellaneous PermitWiring & bonding for in ground swimming pool B24004019Howard County—
Nov 13, 2024Residential Electrical Miscellaneous Permit200a underground-400a underground heavy upHoward County—
Jul 22, 2024Commercial Electrical PermitMount Zion United Methodist Church/ Wiring for new pavilion; Intercept & extend existing underground conduit & feeder; 100a subpanel, 24 recessed lights, 6 ceilHoward County—
Apr 1, 2024Residential Electrical Miscellaneous PermitRelocate existing outdoor chiller; Will require a trench inspection; No additional load or equipmentHoward County—
Mar 25, 2024Residential Electrical Miscellaneous PermitThis permit application is for a swimming pool built without a permit.Howard County—

Permit status

Where its permits stand, as the departments report them.

  • Completed12
  • Closed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.