Contractor · Electrical
PLUG IT IN SOLAR
13 building permits since 2025 in Los Angeles city, CA; Burbank city, CA and Anaheim city, CA, across 3 counties.
- Building permits
- 13
- Reported job value
- —
- Active
- 2025–2026
- Latest permit
- Mar 11, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA7
- Burbank city, CA2
- Anaheim city, CA1
- Fontana city, CA1
- Santa Clarita city, CA1
- Yorba Linda city, CA1
Permits by year
By issue date (application date where there is none).
07.515
11
20252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 2 |
| 2026 (YTD) | 11 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical11
- Solar8
- Battery storage4
- HVAC1
- Remodels1
- Bathrooms1
- Generators1
- EV chargers1
Permit types
As the building departments classify them.
- Electrical10
- Solar2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 11, 2026 | Electrical | Install 100a 3-phase 240v disconnect for generator | Los Angeles City | — |
| Mar 4, 2026 | Electrical | 400a class 320 main panel | Los Angeles City | — |
| Feb 25, 2026 | Solar | Install 13 PV modules (5.66KW) with 13 micro-inverters. SYMBIUM-project_c7a1dbeb-902c-4d44-8ba1-8479450d44fd | Burbank City | — |
| Feb 12, 2026 | Electrical | Install (n) roof-mounted photovoltaic system and (n) storage battery system with subpanel per plan at sfd | Santa Clarita City | — |
| Feb 10, 2026 | Electrical | Permit for installation of an energy storage system: (01) tesla powerwall 3 (11.5kw, 13.5kwh). Existing pv systems | Fontana City | — |
| Feb 10, 2026 | Electrical | Installation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling. | Los Angeles City | — |
| Jan 20, 2026 | Electrical | Eplan) pv1 for installation of roof mounted solar panels and installation of energy storage system. Pv system includes 15 modules with 15 microinverters, 2 ener | Los Angeles City | — |
| Jan 13, 2026 | Electrical | Install 125 amp subpanel with 60 amp breaker for solar app permit 25bsa00181 | Yorba Linda City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled7
- Active5
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.