Contractor · General building

peter a laroche

13 building permits since 2022 in Falmouth town, MA.

Building permits
13
Reported job value
—
Active
2022–2026
Latest permit
Oct 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA13

Permits by year

By issue date (application date where there is none).

02.55
5
2022202420252026*
* 2026 is year to date.
View as table
YearPermits
20222
20245
20252
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Kitchens3
  • Bathrooms2
  • Windows & doors2
  • Remodels1
  • Roofing1

Permit types

As the building departments classify them.

  • RESI.12
  • COMM.1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 2, 2026RESI.remove and replace the damaged sheetrock exterior wall and section of ceiling in the kitchen, replace the cabinetsFalmouth Town—
Sep 1, 2026RESI.removal of wet interior building materials to include: sheetrock, insulation, flooring and trimFalmouth Town—
Aug 12, 2026RESI.removal of interior building materials damaged by fireFalmouth Town—
Feb 27, 2026RESI.removal of interior building materials damaged by fire. no repairsFalmouth Town—
Nov 3, 2025RESI.removal of smoke damaged interior building materials, interior trim, drywall and insulationFalmouth Town—
May 30, 2025COMM.removal and replacement of wet building materials damaged by waterFalmouth Town—
Sep 30, 2024RESI.removal of fire damaged building materials in the kitchen to include: plaster wall, insulation, flooring, cabinets and counters. all work ic confined to the intFalmouth Town—
Jul 19, 2024RESI.remove the roof over the kitchen and dining room. the existing roof trusses were cut to create a vaulted ceiling in the dining room at some point in the past. rFalmouth Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed9
  • Issued4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.