Contractor · Electrical
NLITN ENERGY SOLUTIONS
13 building permits since 2025 in Riverside County, CA; San Bernardino County, CA and Laguna Niguel city, CA, across 4 counties — $500 in reported job value over 1 permits that state one.
- Building permits
- 13
- Reported job value
- $500
- Active
- 2025–2026
- Latest permit
- Mar 12, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Riverside County, CA3
- San Bernardino County, CA2
- Laguna Niguel city, CA2
- Anaheim city, CA1
- Huntington Beach city, CA1
- Murrieta city, CA1
- Oceanside city, CA1
- Orange city, CA1
- Vista city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 1 |
| 2026 (YTD) | 12 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar11
- Electrical11
- Battery storage3
- Electric meters1
Permit types
As the building departments classify them.
- Electrical10
- BLD- Electrical Meter Change Out (MPU)1
- Building Misc - Photovoltaic System (PV)1
- SFD SOLAR APP PLUS WITH ESS1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 12, 2026 | Electrical | Residential roof top pv 11.5kw - solarapp+ id: sa20260310-6255-134-15522-a | San Bernardino County | — |
| Mar 10, 2026 | Electrical | Residential roof top pv 11.5kw - solarapp+ id: sa20260310-6255-134-15522-a | San Bernardino County | — |
| Mar 10, 2026 | Electrical | Main panel upgrade 200 amps ***contractor to be onsite for elec panel inspection*** ***refer to stainless steel ground rod requirement per hbmc 17.48.040*** *** | Huntington Beach City | — |
| Feb 23, 2026 | Electrical | Residential photovoltaic system - microinverters (without ess) | Anaheim City | — |
| Feb 19, 2026 | Electrical | Rooftop mounted solar energy system pv+st | Riverside County | — |
| Feb 17, 2026 | Electrical | Residential installation of 28 (430w) modules, 01 - tesla powerwall 3 integrated solar and battery/ess; no mpu | Orange City | — |
| Feb 13, 2026 | Electrical | Rooftop mounted solar energy system pv+st | Riverside County | — |
| Feb 12, 2026 | Electrical | Rooftop mounted solar energy system pv+st | Riverside County | — |
Permit status
Where its permits stand, as the departments report them.
- Active5
- Finaled5
- Not stated2
- Closed1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.