Contractor · Plumbing
NEWTON INDUSTRIES LLC
13 building permits since 2003 in Mesa city, AZ — $3,800 in reported job value over 6 permits that state one.
- Building permits
- 13
- Reported job value
- $3.8K
- Active
- 2003–2004
- Latest permit
- Aug 30, 2004
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ13
Permits by year
By issue date (application date where there is none).
048
8
20032004
View as tableHide table
| Year | Permits |
|---|---|
| 2003 | 5 |
| 2004 | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Gas11
- Plumbing7
- Pools & hot tubs7
Permit types
As the building departments classify them.
- RES13
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 30, 2004 | RES | RUN 260' OF 2" PE GASLINE TO NEW 400K BTU POOL HEATER. GASLINE MUST BE RUN 18"DEEP WITH 14GA TRACERWIRE. UPGRADE METER TO ROTARY 8C, NEW TOTAL BTU DEMAND IS 662 | Mesa | $1,000 |
| Jun 16, 2004 | RES | PLUMBING PERMIT TO ADD ADDITIONAL GASLINE RUN FROM EXISTING LINE OF THE POOL HEATER. NEW GAS RUN 140' OF 3/4"PE BURIED MIN 18" BELOW GRADE WITH COPPER TRACER WI | Mesa | $1,000 |
| Jun 15, 2004 | RES | ADDING GAS LINE FROM METER TO SERVE NEW GAS GRILL (50K) AND FOR LISTED FIRE PIT (75K). EXISTING CLASS 250 METER SERVING 335K TO BE UPGRADED TO CLASS 400 METER T | Mesa | — |
| May 28, 2004 | RES | CONNECT TO EXISTING 2" STUB OUT AND RUN 100' OF 2" PE AND 10' OF 3/4" PE TO NEW 5,000 BTU TIKI TORCH, RUN 15' OF 2" PE AND 20' OF 1" TO NEW 50,000 BTU BBQ, RUN | Mesa | — |
| May 5, 2004 | RES | INSTALL 8 FT OF 1/2" SCOTCHKOTE GAS PIPING TO 35,000 BTU BBQ FROM 3/4" GAS STUB-OUT W/ 12" COVER AND SLEEVED UNDER KOOLDECKING PER CHAPTER 12 1994 UPC. GAS PRES | Mesa | — |
| Mar 24, 2004 | RES | INSTALLATION OF 115' 1 1/2" PE 18" DEEP WITH 14 GAUGE TRACER WIRE TO 400,000 BTU POOL HEATER AND 15' 3/4" PE 18" DEEP WITH 14 GAUGE TRACER WIRE TO 75,000 BTU UL | Mesa | $500 |
| Feb 26, 2004 | RES | 180' OF 1 1/2 PE GASLINE TO SPA HEATER (400k) 650 TOTAL CFH GAS METER=ROTORY 8C-GP-12-15 | Mesa | $500 |
| Feb 5, 2004 | RES | INSTALL APPROX 30 FT OF 1 1/4" PE GAS PIPING TO 400,000 BTU POOL HEATER W/ 18" COVER & 14 GA COPPER TRACER WIRE PER CHAPTER 12 1994 UPC. GAS PRESSURE TEST REQUI | Mesa | $300 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.