Contractor · Electrical

NEOSUN

13 building permits since 2023 in Los Angeles city, CA.

Building permits
13
Reported job value
—
Active
2023–2026
Latest permit
Mar 11, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA13

Permits by year

By issue date (application date where there is none).

0510
9
20232026*
* 2026 is year to date.
View as table
YearPermits
20239
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical13
  • Solar3

Permit types

As the building departments classify them.

  • Electrical13

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 11, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Feb 10, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Jan 28, 2026ElectricalMain panel upgrade to 200ampLos Angeles City—
Jan 28, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
May 16, 2023Electrical—Los Angeles City—
May 3, 2023Electrical—Los Angeles City—
Apr 4, 2023Electrical—Los Angeles City—
Apr 4, 2023Electrical—Los Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated9
  • Active2
  • Finaled2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.