Contractor · General building
MERCY HOSPITAL OF BUFFALO
13 building permits since 2002 in Buffalo city, NY — $3,917,373 in reported job value over 8 permits that state one.
- Building permits
- 13
- Reported job value
- $3.9M
- Active
- 2002–2016
- Latest permit
- Nov 14, 2016
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Buffalo city, NY13
Permits by year
By issue date (application date where there is none).
024
4
2002201020132016
View as tableHide table
| Year | Permits |
|---|---|
| 2002 | 1 |
| 2004 | 4 |
| 2010 | 3 |
| 2012 | 2 |
| 2013 | 1 |
| 2014 | 1 |
| 2016 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels1
- Telecom1
- Electrical1
- New construction1
Permit types
As the building departments classify them.
- ELEVATOR7
- PLAN-COPY4
- ELECTRICAL1
- GC1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 14, 2016 | ELEVATOR | MODENIZATION OF ELEVATOR CONTACT ANDY KUBRICH 585-245-3280 | Buffalo City | $112,142 |
| Jul 15, 2014 | ELEVATOR | Modernization of three [3] COMMERCIAL passenger elevators with eight [8] stops each in accordance with attached drawings and specifications. Plans filed. Full f | Buffalo City | $478,656 |
| Oct 11, 2013 | ELEVATOR | Modernization of one [1] COMMERCIAL passenger elevator with eight [8] stops in accordance with attached specifications. Specifications filed. Full final accepta | Buffalo City | $98,000 |
| Nov 27, 2012 | ELEVATOR | Modernization of one [1] COMMERCIAL passenger elevator with six [6] stops.in accordance with attached drawings. Plans filed. Full final acceptance inspection re | Buffalo City | $58,575 |
| Aug 17, 2012 | ELEVATOR | Install one [1] new COMMERCIAL [GLASS BACK] passenger elevator with six [6] stops. Plans filed. Full final acceptance inspection required. MERCY HOSPITAL PARKIN | Buffalo City | $72,000 |
| Oct 22, 2010 | GC | ALTERATIONS AND RENOVATIONS TO 2ND FLOOR, AND INFILL OF LIGHT WELL TO CREATE NEW MEDICAL IMAGING, LABORATORY, TWO OPERATING ROOMS, CASHIER, AND ADMINISTRATION, | Buffalo City | $3,000,000 |
| Aug 17, 2010 | ELEVATOR | Install one [1] new passenger elevator with three [3] stops. Plans filed. Full final acceptance inspection required. MERCY HOSPITAL | Buffalo City | $60,000 |
| Mar 11, 2010 | ELEVATOR | Install one [1] new passenger elevator with three [3] stops. Plans filed. Full final acceptance inspection required. | Buffalo City | $38,000 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.