Contractor · Electrical
MELTON ELECTRIC
13 building permits since 2023 in Sugar Land city, TX — $32,856,000 in reported job value over 6 permits that state one.
- Building permits
- 13
- Reported job value
- $32.9M
- Active
- 2023–2026
- Latest permit
- Feb 12, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sugar Land city, TX13
Permits by year
By issue date (application date where there is none).
048
7
2023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 7 |
| 2024 | 3 |
| 2025 | 2 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels7
- Electrical5
- Generators2
- Additions1
- Demolition1
- Electric meters1
Permit types
As the building departments classify them.
- COMMERCIAL7
- COMMERCIAL ELECTRICAL SERVICE3
- COMMERCIAL ELECTRICAL LIGHTING/OUTLETS1
- ELECTRICAL - GENERATOR1
- GENERATOR1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 12, 2026 | COMMERCIAL ELECTRICAL SERVICE | WE HAD CPE OUT TO DISCONNECT METER FOR EMERGENCY REPAIRS THAT INCLUDED REPLACING 100 AMP BREAKER. WE NEED CPE BACK OUT TO RECONNECT POWER | Sugar Land | $2,000 |
| Apr 8, 2025 | COMMERCIAL | TENANT FIT OUT FOR USE AS POTTERY PAINTING STUDIO | Sugar Land | — |
| Jan 8, 2025 | COMMERCIAL | SABIC - RENOVATION OF EXISTING LABS WITH ADDITION OF NEW FINISHES AND LAB UTILITIES | Sugar Land | — |
| Aug 30, 2024 | ELECTRICAL - GENERATOR | MELTON TO PERFORM PREVENTATIVE MAINTENANCE DROP OUT FUSE LINKS AND HAVE CENTERPOINT RECONNECT POWER LATER IN THE DAY. | Sugar Land | — |
| Aug 30, 2024 | GENERATOR | MELTON TO PERFORM PREVENTATIVE MAINTENANCE DROP OUT FUSE LINKS AND HAVE CENTERPOINT RECONNECT POWER LATER IN THE DAY. | Sugar Land | $130,000 |
| Mar 8, 2024 | COMMERCIAL | REMODEL OF THE 1ST FLOOR OF THE EXISTING KELSEY SEYBOLD CLINIC | Sugar Land | — |
| Aug 24, 2023 | COMMERCIAL ELECTRICAL SERVICE | OUTAGE NEEDED TO REPLACE 100A MAIN CIRCUIT BREAKER IN PANEL FEEDING THE MARQUEE SIGN | Sugar Land | — |
| Jul 12, 2023 | COMMERCIAL | NEW BUILDOUT OF THE KELSEY SEYBOLD 1ST FLOOR | Sugar Land | $9,697,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed8
- Expired5
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.