Contractor · Electrical
MARK BRUCE
13 building permits since 2021 in Memphis city, TN and Germantown city, TN — $1,250 in reported job value over 2 permits that state one.
- Building permits
- 13
- Reported job value
- $1.3K
- Active
- 2021–2026
- Latest permit
- Aug 12, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Memphis city, TN10
- Germantown city, TN3
Permits by year
By issue date (application date where there is none).
036
6
20212023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 2 |
| 2023 | 2 |
| 2024 | 1 |
| 2025 | 6 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical13
- HVAC1
- Kitchens1
- Remodels1
- Bathrooms1
- Plumbing1
- Water heaters1
Permit types
As the building departments classify them.
- COMMERCIAL ELECTRICAL PERMIT9
- RESIDENTIAL ELECTRICAL PERMIT4
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 12, 2026 | COMMERCIAL ELECTRICAL PERMIT | Install low voltage cable for data and phone in new expansion area | Germantown city | — |
| May 1, 2026 | RESIDENTIAL ELECTRICAL PERMIT | Install Light in new family room and closet. Install receptacles in new family room. Using 2 existing 20 amp 120 volt circuits that were roughed when house was | Germantown city | $750 |
| Oct 27, 2025 | COMMERCIAL ELECTRICAL PERMIT | Add 5 -120-volt 20-amp receptacle circuits on showroom floor. Add light switch for lights 120-volt 20-amp circuit | Germantown city | — |
| Aug 13, 2025 | RESIDENTIAL ELECTRICAL PERMIT | Service was disconnected after storm damage and MLGW stated it needs a safety inspection and MLGW release before they will reconnect after being disconnected lo | Memphis city | $500 |
| Aug 12, 2025 | COMMERCIAL ELECTRICAL PERMIT | Remodel kitchen, Add 20 amp 208 3 phase circuit for garbage disposal. Add 30 amp 208 3 phase circuit for dishwasher. Move a few lights, for in light new work ar | Memphis city | — |
| May 21, 2025 | COMMERCIAL ELECTRICAL PERMIT | Double permit for others replacing lights without permit 3- 120-volt circuits for lights and repairs from power off safety inspection reconnect. | Memphis city | — |
| May 21, 2025 | COMMERCIAL ELECTRICAL PERMIT | Install low voltage wire for data and phones | Memphis city | — |
| May 21, 2025 | COMMERCIAL ELECTRICAL PERMIT | Install cabling for low voltage phones and data. | Memphis city | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.