Contractor · Electrical

LANSING KAREN M TRUSTEE

13 building permits since 2009 in Santa Cruz County, CA.

Building permits
13
Reported job value
—
Active
2009–2025
Latest permit
Aug 6, 2025

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA13

Permits by year

By issue date (application date where there is none).

024
4
200920132016202220232025
View as table
YearPermits
20091
20132
20162
20222
20232
20254

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical4
  • Solar3
  • Roofing3
  • Battery storage2
  • Windows & doors2
  • Accessory dwelling units1
  • Gas1
  • Remodels1

Permit types

As the building departments classify them.

  • Building13

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 6, 2025BuildingWindow/door permit to replace in-kind 2-5 windows or doors at an existing habitable structure. Bedroom windows need 5.7 sq ft minimum net clear opening. Refer tSanta Cruz County—
Jun 18, 2025BuildingExtension #1 granted to permit B-225267 to 12/17/2025Santa Cruz County—
Jun 17, 2025BuildingRemoval and re-installation of existing PV system permitted under issued B-225267. Verify and/or install listed smoke and carbon monoxide alarms, or combinationSanta Cruz County—
Jun 4, 2025BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure <600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—
Jul 11, 2023BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Change Order (Construction Change Document) # 1 to builSanta Cruz County—
Mar 8, 2023BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a (14.0)kWh, (2) battery energy storage system Santa Cruz County—
Dec 8, 2022BuildingConstruction Change Document (aka Change Order) #1 to permit B-225267 to update the single line diagram to match the site conditions, with the well pump tied toSanta Cruz County—
Oct 5, 2022BuildingSRA-High, Central FPD Go on line and check the status of your application, correction and approval letters will not be mailed. Install a roof mount (6.68 )kW, (Santa Cruz County—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.