Contractor · HVAC

John Walker

13 building permits since 2011 in Boston city, MA; Fitchburg city, MA and Newport city, RI, across 8 counties — $6,611,334 in reported job value over 9 permits that state one.

Building permits
13
Reported job value
$6.6M
Active
2011–2026
Latest permit
May 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boston city, MA2
  • Fitchburg city, MA2
  • Newport city, RI2
  • North Andover town, MA1
  • Acton town, MA1
  • Bridgewater Town city, MA1
  • Bolton town, MA1
  • Barrington town, RI1
  • Middletown town, RI1
  • Westerly town, RI1

Permits by year

By issue date (application date where there is none).

024
4
2018202220242026*
* 2026 is year to date.
View as table
YearPermits
20112
20181
20211
20221
20232
20244
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC5
  • Electrical3
  • Gas2
  • Remodels2
  • Bathrooms2
  • Heat pumps2
  • Demolition1

Permit types

As the building departments classify them.

  • Mechanical Permit5
  • Building Permit / Use and Occupancy2
  • ERECT2
  • Building Permit (Commercial)1
  • COMM.1
  • *Electrical Permit1
  • Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 21, 2026Mechanical PermitEmergency replacement of leaking heating oil tank. As well as fill and vent piping , alarm and formatic valve.Middletown Town$2,500
Apr 22, 2025Building Permit (Commercial)Repair / replace finishes / new paint as required throughout. New refrigeration & freezer cases. Refrigeration change from Gas to C02. (E) Demo prep to receive Acton Town$500,000
Dec 11, 2024Mechanical Permit6 zone mitsushibi mini split system complete with interior equipment and exterior equipment all refrigeration piping, drainage and required communication wiringNewport City$52,500
Aug 13, 2024Building Permit / Use and OccupancyAdding a farmers porch to the front of the house. The porch will be the length of the front of the house and will not come out any further towards the road thanFitchburg City—
Jul 16, 2024Building Permit / Use and OccupancyAdding a second floor to the existing stucture. The second floor would consist of 2 bedrooms, a bathroom, a great room and some unfinished storage area.Fitchburg City—
Mar 11, 2024Mechanical PermitInstallation of mini splits and condensers. 3 units and one branch box on first floor, 6 units and 2 branch boxes on second floor. 2 condensers behind building Newport City$50,000
Nov 15, 2023Mechanical Permit—Westerly Town—
Sep 14, 2023Mechanical Permit80,000 BTU gas furnace replacement and 2-1/2 ton ac unit installBarrington Town$15,000

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Active3
  • C/o issued1

Also on file as

The same name elsewhere

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.