Contractor · HVAC
John Walker
13 building permits since 2011 in Boston city, MA; Fitchburg city, MA and Newport city, RI, across 8 counties — $6,611,334 in reported job value over 9 permits that state one.
- Building permits
- 13
- Reported job value
- $6.6M
- Active
- 2011–2026
- Latest permit
- May 21, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boston city, MA2
- Fitchburg city, MA2
- Newport city, RI2
- North Andover town, MA1
- Acton town, MA1
- Bridgewater Town city, MA1
- Bolton town, MA1
- Barrington town, RI1
- Middletown town, RI1
- Westerly town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2011 | 2 |
| 2018 | 1 |
| 2021 | 1 |
| 2022 | 1 |
| 2023 | 2 |
| 2024 | 4 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC5
- Electrical3
- Gas2
- Remodels2
- Bathrooms2
- Heat pumps2
- Demolition1
Permit types
As the building departments classify them.
- Mechanical Permit5
- Building Permit / Use and Occupancy2
- ERECT2
- Building Permit (Commercial)1
- COMM.1
- *Electrical Permit1
- Electrical Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 21, 2026 | Mechanical Permit | Emergency replacement of leaking heating oil tank. As well as fill and vent piping , alarm and formatic valve. | Middletown Town | $2,500 |
| Apr 22, 2025 | Building Permit (Commercial) | Repair / replace finishes / new paint as required throughout. New refrigeration & freezer cases. Refrigeration change from Gas to C02. (E) Demo prep to receive | Acton Town | $500,000 |
| Dec 11, 2024 | Mechanical Permit | 6 zone mitsushibi mini split system complete with interior equipment and exterior equipment all refrigeration piping, drainage and required communication wiring | Newport City | $52,500 |
| Aug 13, 2024 | Building Permit / Use and Occupancy | Adding a farmers porch to the front of the house. The porch will be the length of the front of the house and will not come out any further towards the road than | Fitchburg City | — |
| Jul 16, 2024 | Building Permit / Use and Occupancy | Adding a second floor to the existing stucture. The second floor would consist of 2 bedrooms, a bathroom, a great room and some unfinished storage area. | Fitchburg City | — |
| Mar 11, 2024 | Mechanical Permit | Installation of mini splits and condensers. 3 units and one branch box on first floor, 6 units and 2 branch boxes on second floor. 2 condensers behind building | Newport City | $50,000 |
| Nov 15, 2023 | Mechanical Permit | — | Westerly Town | — |
| Sep 14, 2023 | Mechanical Permit | 80,000 BTU gas furnace replacement and 2-1/2 ton ac unit install | Barrington Town | $15,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed9
- Active3
- C/o issued1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.