Contractor · HVAC

finbarr mechanical

13 building permits since 2023 in Somerville city, MA; Brookline town, MA and Milton town, MA, across 3 counties — $986,000 in reported job value over 9 permits that state one.

Building permits
13
Reported job value
$986K
Active
2023–2026
Latest permit
Jul 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Somerville city, MA3
  • Brookline town, MA3
  • Milton town, MA3
  • Lexington town, MA2
  • Hingham town, MA1
  • Norwell town, MA1

Permits by year

By issue date (application date where there is none).

048
7
202320252026*
* 2026 is year to date.
View as table
YearPermits
20237
20255
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC5
  • Plumbing5
  • Demolition5
  • Roofing2
  • Remodels1
  • Heat pumps1

Permit types

As the building departments classify them.

  • SHT MTL3
  • Commercial Mechanical - Sheet Metal2
  • Commercial Plumbing1
  • Mechanical1
  • PLUMB.1
  • Sheet Metal1
  • SHTMTL1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 13, 2026SHTMTLsheet metal work for the south...Hingham Town$80,000
Oct 7, 2025MechanicalRelocating about 40 existing chilled beams, then installing 4 new chilled beams and 4 new VAVs with reheat coils.Lexington Town$108,000
Sep 9, 2025Sheet MetalDemo existing and replace with new VAVs, chilled beams and RGDs.Lexington Town$76,000
Jul 24, 2025SHT MTLfurnish and install (3) exhaust fans, (1) air handler unit and (1) erv, installing associated roof ductwork and indoor ductwork interconnections between pre-fabMilton Town$70,000
Jun 23, 2025PLUMB.installing a crawlspace drain piping, no new equipment, and plumbing interconnections between prefab building modulesMilton Town$205,000
Mar 17, 2025SHT MTL—Norwell Town—
Nov 9, 2023SHT MTLreplace roof exhaust fan and new heat pump systemsMilton Town$185,000
Oct 2, 2023Commercial Mechanical - Sheet MetalDemo existing duct and install new duct. ALL WORK TO COMPLY WITH 780 CMR AND LOCAL ZONING REQUIREMENTS. DUST MITIGATION REQUIRED DURING PERMITTED WORKBrookline Town$90,000

Permit status

Where its permits stand, as the departments report them.

  • Issued6
  • Closed3
  • Completed2
  • Finaled1
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.