Contractor
Entrust Solution Group - Marcus Jimenez
13 building permits since 2024 in Travis County, TX.
- Building permits
- 13
- Reported job value
- —
- Active
- 2024–2026
- Latest permit
- Sep 8, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Travis County, TX13
Permits by year
By issue date (application date where there is none).
02.55
5
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 5 |
| 2025 | 3 |
| 2026 (YTD) | 5 |
Permit types
As the building departments classify them.
- Utility Permit13
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 8, 2026 | Utility Permit | Altice is proposing to install approximately 3,348' of Overhead fiber cable on existing poles. Via overlashing and new build construction as shown on attached p | Travis County | — |
| Jul 30, 2026 | Utility Permit | Spectrum is proposing to install a power supply cabinet at the location shown on the attached plans. As well as approximately 8 ft of underground cable from pol | Travis County | — |
| Jul 8, 2026 | Utility Permit | Spectrum is proposing to install approximately 971' of Overhead cable on existing poles. Along Shoreline Dr. Route was submitted to the City of Austin for permi | Travis County | — |
| Apr 6, 2026 | Utility Permit | Spectrum is proposing to install approximately 3,352' of Overhead fiber cable via Over lash Contruction on existing poles along Gilbert Rd. As well as 19,332' o | Travis County | — |
| Feb 9, 2026 | Utility Permit | Spectrum is proposing to install approximately 10,068' of UG fiber cable via directional bore within the following county roads; Brean Down Rd, Wirrall Rd, Wort | Travis County | — |
| Sep 29, 2025 | Utility Permit | Spectrum is proposing to install approximately 3290' of Overhead fiber cable via overlash install. On existing pole along Tower Rd and Suncrest Rd. Route goes e | Travis County | — |
| Jun 20, 2025 | Utility Permit | Spectrum is proposing to install approximately 9'555 of Overhead Fiber cable on existing poles along Jesse Bohls Dr. | Travis County | — |
| Apr 25, 2025 | Utility Permit | Spectrum is proposing to install approximately 2,267 linear ft of UG fiber cable. Along the westside of the Crofford Ln. Route encroaches on TXDOT and Railroad | Travis County | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.