Contractor · Electrical

ELITE ENERGY ELECTRIC LLC

13 building permits since 2024 in Marin County, CA; Contra Costa County, CA and Livermore city, CA, across 6 counties — $205,364 in reported job value over 8 permits that state one.

Building permits
13
Reported job value
$205.4K
Active
2024–2026
Latest permit
Jun 24, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Marin County, CA5
  • Contra Costa County, CA2
  • Livermore city, CA2
  • Capitola city, CA1
  • Mountain View city, CA1
  • San Jose city, CA1
  • Santa Rosa city, CA1

Permits by year

By issue date (application date where there is none).

048
7
202420252026*
* 2026 is year to date.
View as table
YearPermits
20243
20253
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar10
  • Battery storage7
  • Electrical7
  • Roofing1
  • Electric meters1

Permit types

As the building departments classify them.

  • RESIDENTIAL5
  • Electrical4
  • PVR2
  • B-Residential1
  • EL1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 24, 2026PVRInstall new 4.1 kW DC rooftop photovoltaic system consisting of 10 Qcells Q.PEAK DUO BLK ML-G10.C+ 410 modules with 10 Enphase IQ8HC microinverters. Install oneContra Costa County$31,982
Jun 24, 2026PVRInstallation of a residential rooftop photovoltaic solar energy system at 75 Muth Dr, Orinda, CA 94563. System consists of 12 Silfab SIL-440QD photovoltaic moduContra Costa County$38,212
Jun 23, 2026RESIDENTIAL—Marin County$53,683
Mar 17, 2026Electrical—San Jose City—
Feb 24, 2026ElectricalRevision 2: backup load center (subpanel) bus rating from 125a to 200a to align with the revised and approved solarapp. Feeder ocpd remains 100a. No changes to Livermore City—
Feb 5, 2026ElectricalInstall a new roof-mounted photovoltaic (pv) solar energy system with battery energy storage on an existing single-family residence. Scope includes approximatelSanta Rosa City—
Jan 20, 2026ElectricalRevision: system size changed to 6.23kw, 15 modules (for photovoltaic roof mount installation of 5.72kw system, 13 panels, and (1) tesla bus powerwall 3)Livermore City—
Sep 3, 2025RESIDENTIALInstall 10.63kw solar system and 1 Franklin aPower 2 BatteryMarin County$50,487

Permit status

Where its permits stand, as the departments report them.

  • Not stated6
  • Active2
  • Issued2
  • Finaled2
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.