Contractor · Electrical

East Coast Heating and Air Conditioning

13 building permits since 2023 in Brentwood town, NH; Exeter town, NH and Barrington town, NH, across 3 counties — $18,600 in reported job value over 3 permits that state one.

Building permits
13
Reported job value
$18.6K
Active
2023–2026
Latest permit
Sep 15, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Brentwood town, NH4
  • Exeter town, NH3
  • Barrington town, NH3
  • Saco city, ME1
  • North Hampton town, NH1
  • Dover city, NH1

Permits by year

By issue date (application date where there is none).

02.55
5
202320242026*
* 2026 is year to date.
View as table
YearPermits
20232
20245
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • HVAC3
  • Kitchens2
  • Plumbing2
  • Water heaters2
  • Remodels1
  • Heat pumps1

Permit types

As the building departments classify them.

  • Electrical9
  • Mechanical2
  • Electrical Permit1
  • Electrical Wiring1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 15, 2026Electrical100 amp Sub panel installation: Run new feed for garage sub panel. Install surface mounted 100 amp panel. Install 100 amp breaker in main panel.Barrington Town—
Sep 11, 2026MechanicalInstalling : Bradford White, Bradford White PowerStor SS Indirect, 40 Gal, Water HeaterBarrington Town—
Aug 17, 2026ElectricalLiving room lighting installation: Add four 6” gimbal style wafer fixtures in living room. Run lighting load from switch bank. Install decora style dimmer in exBarrington Town—
May 11, 2026ElectricalAdd 40 amp circ., receptables in kitchen, wafer light, ceiling fan and 2 outdoor receptaclesExeter Town$4,000
Mar 12, 2024Electrical WiringRunning a new and complete line voltage feed from existing electrical panel to new outdoor unit.Dover City$1,600
Mar 6, 2024ElectricalRun a new and complete line voltage feed from existing electrical panel to new outdoor unit.Brentwood Town—
Mar 6, 2024ElectricalRun wire for new electric water heater.Brentwood Town—
Mar 6, 2024ElectricalRun a new and complete line voltage feed from existing electrical panel to new outdoor unit.Brentwood Town—

Permit status

Where its permits stand, as the departments report them.

  • Issued5
  • Approved3
  • Closed2
  • Active1
  • Completed1
  • C/o issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

East Coast Heating and Air Conditioning — Building Permits & Contractor Profile | Buildstats