Contractor · Plumbing

DOW ALLAN & MARGARET ROSE

13 building permits since 1997 in Santa Cruz County, CA.

Building permits
13
Reported job value
—
Active
1997–2026
Latest permit
Oct 1, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA13

Permits by year

By issue date (application date where there is none).

01.53
3
2002202020242026*
* 2026 is year to date.
View as table
YearPermits
19973
20021
20181
20201
20232
20242
20251
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing3
  • Plumbing3
  • Electrical3
  • Gas2
  • Kitchens2
  • Telecom2
  • Bathrooms2
  • Remodels1
  • Water heaters1
  • Electric meters1

Permit types

As the building departments classify them.

  • Building13

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 1, 2026BuildingExtension to permit B-245028 to 3/30/27Santa Cruz County—
Jul 9, 2026BuildingReplace electrical service panel with a new <320Amp service (<400Amp maximum rated) service panel at an existing structure. Permit to include 320A SP upgrade, 2Santa Cruz County—
Aug 6, 2025BuildingModifications to an existing Wireless site to include removing (2) (E) antennas. Install (3) (N) antennas on (E) mounts. Installing (3) (N) 8863 radio units insSanta Cruz County—
Oct 24, 2024BuildingCentral Fire/LRA Permit to address a stop work order 18912 Tenant Improvement to remodel kitchen and enlarge restroom to meet ADA requirements in an existing reSanta Cruz County—
Feb 13, 2024BuildingScotts Valley FPD/LRA whole house water repipe. Starting at main house shut off valve on riser line. repipe all domestic wter lines to all existing fixtures andSanta Cruz County—
May 16, 2023BuildingCentral FPD/LRA Replace main water line due to rust; Install a new 1 1/2" shut off right behind themater so the property can be easily shut down in the future. Santa Cruz County—
Apr 13, 2023BuildingPlumbing permit to include replacing fixtures/repairing water or gas lines at an existing structure. Install listed smoke detectors and carbon monoxide alarms oSanta Cruz County—
Mar 26, 2020BuildingDisc #171372 Flood Zone AE Proposal to construct a new roof mounted Wireless Communication Facility at an existing commercial building (Wilson’s Tire). Project Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed11
  • Active2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

DOW ALLAN & MARGARET ROSE — Building Permits & Contractor Profile | Buildstats