Contractor · General building
Daniel Bermea
13 building permits since 2026 in Conroe city, TX.
- Building permits
- 13
- Reported job value
- —
- Active
- 2026
- Latest permit
- Aug 31, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Conroe city, TX13
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms12
- Electrical9
- HVAC8
- Plumbing8
- Water heaters8
- Kitchens4
- Windows & doors4
- New construction4
Permit types
As the building departments classify them.
- Electrical5
- Mechanical - HVAC Systems4
- Plumbing4
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 31, 2026 | Electrical | WORK TAKING PLACE IN UNIT A ELECTRICAL ROUGH IN AND FINAL 1 RANGE OVEN 1 MICROWAVE 1 DISHWASHER 1 REFRIDGERATOR 1 WATER HEATER 1 FURNACE/CONDENSOR 1 WASHER 1 DR | Conroe | — |
| Aug 31, 2026 | Electrical | WORK TAKING PLACE IN UNIT A ELECTRICAL ROUGH IN AND FINAL 1 RANGE OVEN 1 MICROWAVE 1 DISHWASHER 1 REFRIDGERATOR 1 WATER HEATER 1 FURNACE/CONDENSOR 1 WASHER 1 DR | Conroe | — |
| Aug 31, 2026 | Mechanical - HVAC Systems | 3 ton hvac system installation on a 1248 sqft heated area Phase 1: Design and Engineering Load Calculations: Perform a residential load calculation (such as ACC | Conroe | — |
| Aug 31, 2026 | Mechanical - HVAC Systems | 3 ton hvac system installation on a 1248 sqft heated area Phase 1: Design and Engineering Load Calculations: Perform a residential load calculation (such as ACC | Conroe | — |
| Jul 11, 2026 | Mechanical - HVAC Systems | 3 ton hvac system installation on a 1248 sqft heated area Phase 1: Design and Engineering Load Calculations: Perform a residential load calculation (such as ACC | Conroe | — |
| Jul 10, 2026 | Electrical | WORK TAKING PLACE IN UNIT A ELECTRICAL ROUGH IN AND FINAL 1 RANGE OVEN 1 MICROWAVE 1 DISHWASHER 1 REFRIDGERATOR 1 WATER HEATER 1 FURNACE/CONDENSOR 1 WASHER 1 DR | Conroe | — |
| Jul 10, 2026 | Electrical | WORK TAKING PLACE IN UNIT A ELECTRICAL ROUGH IN AND FINAL 1 RANGE OVEN 1 MICROWAVE 1 DISHWASHER 1 REFRIDGERATOR 1 WATER HEATER 1 FURNACE/CONDENSOR 1 WASHER 1 DR | Conroe | — |
| Jul 10, 2026 | Mechanical - HVAC Systems | 3 ton hvac system installation on a 1248 sqft heated area Phase 1: Design and Engineering Load Calculations: Perform a residential load calculation (such as ACC | Conroe | — |
Permit status
Where its permits stand, as the departments report them.
- Completed7
- Active4
- Stop work ordered2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.