Contractor · General building
Christopher Pepper
13 building permits since 2022 in Foster town, RI; Providence city, RI and Smithfield town, RI, across 3 counties — $497,376 in reported job value over 12 permits that state one.
- Building permits
- 13
- Reported job value
- $497.4K
- Active
- 2022–2026
- Latest permit
- Apr 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Foster town, RI2
- Providence city, RI2
- Smithfield town, RI2
- Bristol town, RI1
- Cranston city, RI1
- East Providence city, RI1
- Glocester town, RI1
- Lincoln town, RI1
- North Kingstown town, RI1
- Westerly town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 1 |
| 2023 | 2 |
| 2024 | 2 |
| 2025 | 6 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms6
- Windows & doors4
- Kitchens2
- Remodels2
- Additions2
- Plumbing2
- Demolition2
- Electrical1
Permit types
As the building departments classify them.
- Building Permit12
- 1) Building Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 16, 2026 | Building Permit | Build a single-story addition to the specifications of the attached blueprints. The addition will be approximately 30' x 34' and will have a full foundation and | Smithfield Town | $280,000 |
| Feb 7, 2026 | Building Permit | remodel the bathroom, includes demo to the studs, new wall board, new tub/shower, new vanity and sink, new floor. Remove and replace the kitchen cabinets. insta | Providence City | $30,000 |
| Nov 4, 2025 | Building Permit | Build a 18' x 15' addition on the rear of the house according to the building plans submitted. The addition will have a crawl space, The new living space will c | Lincoln Town | $80,000 |
| Sep 18, 2025 | Building Permit | Construct a 7'-3" x 6'-0" bathroom with a 3'-6" wide hallway adjacent to it according to the building plans provided. The bathroom will consist of a shower stal | Smithfield Town | $25,000 |
| Jul 25, 2025 | Building Permit | Modification to Existing | Westerly Town | $7,000 |
| Apr 17, 2025 | 1) Building Permit | Remove the existing front deck, railings and stairs. Dig and pour new footings, build a new 8'6"L x 8W deck, stairs and railings. | Cranston City | $9,000 |
| Mar 31, 2025 | Building Permit | Pour 2- 12"round by 42" deep footings, build a 4'x8' landing off of the existing bedroom sliding door. The landing frame will be built from 2x8 pressure treated | Foster Town | $5,200 |
| Mar 28, 2025 | Building Permit | Demo the 2nd floor bathroom. Build a shower stall that will be tiled. Install new wall and ceiling board. Install a new tile floor. Install new door and window | Providence City | $12,700 |
Permit status
Where its permits stand, as the departments report them.
- Completed10
- Active3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.