Contractor · HVAC

chris pinola

13 building permits since 2016 in Falmouth town, MA; Quincy city, MA and Hanson town, MA, across 3 counties — $35,250 in reported job value over 3 permits that state one.

Building permits
13
Reported job value
$35.3K
Active
2016–2026
Latest permit
Oct 7, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA10
  • Quincy city, MA2
  • Hanson town, MA1

Permits by year

By issue date (application date where there is none).

01.53
3
2019202220242026*
* 2026 is year to date.
View as table
YearPermits
20161
20191
20211
20221
20232
20242
20253
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC13
  • Gas11
  • Heat pumps3
  • Electrical2

Permit types

As the building departments classify them.

  • SHT MTL10
  • Building Permit Application2
  • MECH1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 7, 2026MECHwill install a trane 40,000 btu 96% high efficiency gas furnace with 1.5 tons of cooling. the equipment and all duct will be installed in the basement.Hanson Town$15,250
Jan 13, 2026SHT MTLwill install a 40,000 btu 97% high efficiency gas furnace with 2.5 tons of cooling -equipment and duct work will be installed in the basement. -all duct will beFalmouth Town—
Apr 9, 2025SHT MTLwill install a goodman 60,000 btu 96% high efficiency gas furnace with 3.0 tons of cooling with two zones of honeywell electronic zone dampers. will install a fFalmouth Town—
Apr 2, 2025SHT MTLwill install a bosch 60,000 btu 96% high efficiency gas furnace/ 3.0 ton bosch evaporator coil and 3.0 ton bosch heat pump. will install two zones of duct with Falmouth Town—
Jan 13, 2025SHT MTLwill install a goodman 40,000 btu 96% high efficiency gas furnace with 2.0 tons of coolingFalmouth Town—
Oct 30, 2024SHT MTLwill install a 60,000 btu 96% high efficiency single stage trane gas furnace with 3.0 tons of cooling. will install a 40,000 btu 96% single stage high efficiencFalmouth Town—
Aug 16, 2024SHT MTL1st floor - will install a 40,000 btu 96% high efficiency trane gas fired furnace with 2.5 tons of cooling. the unit and all duct will be installed in the basemFalmouth Town—
Sep 20, 2023SHT MTLfrist floor: will install a 4.0 ton three zone mitsubishi hyper heat pump central air duct system in the basement to condition the air for the first floor, firsFalmouth Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed8
  • Active2
  • Issued2
  • Paid1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.