Contractor · Electrical

CHARGED UP ELECTRIC LLC

13 building permits since 2025 in Olathe city, KS; De Soto city, KS and Overland Park city, KS — $15,073 in reported job value over 12 permits that state one.

Building permits
13
Reported job value
$15.1K
Active
2025–2026
Latest permit
Aug 17, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Olathe city, KS11
  • De Soto city, KS1
  • Overland Park city, KS1

Permits by year

By issue date (application date where there is none).

048
7
20252026*
* 2026 is year to date.
View as table
YearPermits
20256
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical13
  • EV chargers12
  • HVAC1
  • Plumbing1

Permit types

As the building departments classify them.

  • Building - Electrical - Electric Vehicle (EV) Charger Station Residential11
  • Building1
  • Building (Mech/Elec/Plumb)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 17, 2026Building - Electrical - Electric Vehicle (EV) Charger Station ResidentialInstall level 2 Tesla chager with 60 amp breaker.Olathe City$1,510
Jul 28, 2026Building - Electrical - Electric Vehicle (EV) Charger Station ResidentialInstall hardwired Electric vehicle charger in garage.Olathe City$1,235
Jul 28, 2026Building - Electrical - Electric Vehicle (EV) Charger Station ResidentialInstall hardwired 60 amp level 2 electric vehicle charger.Olathe City$1,315
Jul 28, 2026Building - Electrical - Electric Vehicle (EV) Charger Station ResidentialInstall hardwired 60 amp Electric vehicle charger.Olathe City$850
May 21, 2026Building - Electrical - Electric Vehicle (EV) Charger Station ResidentialInstall 60 amp hardwired Tesla EV charger with #4 gauge romex.Olathe City$1,550
May 6, 2026Building - Electrical - Electric Vehicle (EV) Charger Station ResidentialInstall 60 amp Level 2 Tesla charger.Olathe City$1,778
Feb 9, 2026BuildingEE-ElectricalDe Soto City—
Dec 11, 2025Building - Electrical - Electric Vehicle (EV) Charger Station ResidentialInstallation of Tesla Level 2 charging stationOlathe City$1,400

Permit status

Where its permits stand, as the departments report them.

  • Completed11
  • Closed1
  • Finaled1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.