Contractor · Plumbing
BLEVINS HEATING
13 building permits since 2017 in Asheville city, NC — $7,406 in reported job value over 1 permits that state one.
- Building permits
- 13
- Reported job value
- $7.4K
- Active
- 2017–2025
- Latest permit
- Mar 6, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Asheville city, NC13
Permits by year
By issue date (application date where there is none).
01.53
3
20172019202120232025
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2018 | 1 |
| 2019 | 3 |
| 2020 | 1 |
| 2021 | 1 |
| 2022 | 1 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC9
- Gas8
- Plumbing7
- Heat pumps3
- Electrical3
- Water heaters2
- Remodels1
- Generators1
Permit types
As the building departments classify them.
- Res: Gas Piping3
- Res: Multi-Trade Heating3
- Com: Gas Piping2
- Com: Multi-Trade Heating2
- Res: Mechanical2
- Com: Alterations1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 6, 2025 | Com: Alterations | NEW TENANT AND OCCUPANCY MATADOR DISTRIBUTING LLC - RED BULL FOR EXISTING COMMERCIAL BUILDING. WILL BE ADDING RACKING. BUILDING PRESSURE TEST FOR GAS UTILITY. R | Asheville | $7,406 |
| Jan 15, 2025 | Com: Gas Piping | PRESSURE TEST EXISTING GAS PIPING FOR NEW METER SET UP. | City Of Asheville | — |
| Jan 15, 2025 | Com: Gas Piping | Building pressure test for gas utility | City Of Asheville | — |
| Jul 22, 2024 | Res: Mechanical | Install on The Main Floor - INSTALLATION OF 2T UNITS INCLUDING COPPER LINES, DUCTWORK. MINISPLITS INSTALLED BY ANOTHER COMPANY UNDER PERMIT 24-05274. ELECTRICAL | City Of Asheville | — |
| May 30, 2023 | Res: Gas Piping | ADDING A NEW GAS LINE FROM EXISTING LINE TO A GAS RANGE FOR ROBIN SATICKNEY. | City Of Asheville | — |
| Apr 5, 2022 | Res: Gas Piping | INSTALL GAP PIPING FOR DRYER, WATER HEATER, COOKTOP AND FUTURE FURNACE AND GENERATOR FOR PAUL LAMERCA | City Of Asheville | — |
| Apr 15, 2021 | Res: Multi-Trade Heating | REMOVE EXISTING OIL FURNACE, TANK, INSTALLING HI EFFICENCY 2 STAGE GAS FURNACE , 19 SEER HEAT PUMP, EAC REMY HALO PLASMA WITH UV LIGH, STEAM HUMIDIFIER, GAS PIP | City Of Asheville | — |
| Nov 19, 2020 | Res: Mechanical | Vent new fan to exterior wall. | City Of Asheville | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled10
- Revoked2
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.