Contractor · Demolition & excavation
APAC-ATLANTIC, INC
13 building permits since 2014 in Asheville city, NC — $297,621 in reported job value over 5 permits that state one.
- Building permits
- 13
- Reported job value
- $297.6K
- Active
- 2014–2018
- Latest permit
- Jan 9, 2018
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Asheville city, NC13
Permits by year
By issue date (application date where there is none).
0510
10
201420152018
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 10 |
| 2015 | 2 |
| 2018 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Grading & excavation3
- Remodels3
- Demolition2
- Additions1
Permit types
As the building departments classify them.
- Com: Remodel3
- Com: Site Work3
- Fire: Fire Prevention3
- Com: Other2
- Com: Addition1
- Com: Repair-Replacement1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 9, 2018 | Com: Repair-Replacement | REPAIR DAMAGE TO THE BREEZE WAY CAUSED BY A VEHICLE. RE-INSTALL THE WOOD TRIM AND CASING THAT WAS DAMAGED AND RE-INSTALL ORNAMENTAL STEEL SUPPORT, FOR GROCE FUN | Asheville | $9,960 |
| Sep 22, 2015 | Com: Other | MILL TO 3" DEPTH & REPAVE WITH 3" 9.5 HOT MIX ASPHALT 203254 MILL TO 2" DEPTH & REPAVE WITH 2" 9.5 B HOT MIX ASPHALT 785754 STRIPE TO EXISTING LAYOUT FOR FRESH | Asheville | $161,957 |
| Aug 27, 2015 | Com: Site Work | MILL TO 3" DEPTH & REPAVE WITH 3" 9.5 HOT MIX ASPHALT 203254 MILL TO 2" DEPTH & REPAVE WITH 2" 9.5 B HOT MIX ASPHALT 785754 STRIPE TO EXISTING LAYOUT FOR FRESH | Asheville | — |
| Sep 22, 2014 | Com: Addition | DEMOLITION OF EXISTING ASPHALT PARKING LOT AND NEW ASPHALT PAVEMENT, LANDSCAPE FOR ECONOLODGE; | City Of Asheville | $80,000 |
| Sep 17, 2014 | Com: Remodel | MILLING AND REPAIRING ASPHALT INSIDE FENCED AREA FOR T & D TRUCKING INC; INSTALLING NEW H20 FROM BUILDING TO METER | Asheville | $3,500 |
| Sep 11, 2014 | Fire: Fire Prevention | DEMOLITION OF EXISTING ASPHALT PARKING LOT AND NEW ASPHALT PAVEMENT, LANDSCAPE FOR ECONOLODGE; | Asheville | — |
| Aug 27, 2014 | Com: Remodel | REMOVE & REPLACE 497 LF OF 18" C &G, 0" TO 1.5" TRANSITION MILLING FOR TIE DOWN OF ASPHALT OVERLAY, ASPHALT SURFACE TREATMENT FOR CRACK CONTROL, OVERLAY 1.5" OF | Asheville | $42,204 |
| Aug 5, 2014 | Com: Site Work | REMOVE & REPLACE 497 LF OF 18" C &G, 0" TO 1.5" TRANSITION MILLING FOR TIE DOWN OF ASPHALT OVERLAY, ASPHALT SURFACE TREATMENT FOR CRACK CONTROL, OVERLAY 1.5" OF | Asheville | — |
Permit status
Where its permits stand, as the departments report them.
- Issued7
- Finaled4
- Closed2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.