Contractor · Electrical
Z&K Electric LLC
14 building permits since 2025 in Gaston County, NC — $497,798 in reported job value over 6 permits that state one.
- Building permits
- 14
- Reported job value
- $497.8K
- Active
- 2025–2026
- Latest permit
- Oct 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Gaston County, NC14
Permits by year
By issue date (application date where there is none).
0510
9
20252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 5 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- HVAC4
- Remodels4
- Bathrooms4
- Gas3
- Electric meters3
- Kitchens2
- Plumbing2
- Roofing1
- Additions1
Permit types
As the building departments classify them.
- Single Trade (Residential) - Electrical7
- Alteration / Remodel (Residential)4
- Addition (Residential)1
- HVAC Changeout - Commercial Structure1
- HVAC Change Out - Gas1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 16, 2026 | Addition (Residential) | This project is a comprehensive multi-room addition to an existing home, consisting of a new double-car garage, a master bedroom and bathroom suite, a bonus roo | Gaston County | $204,479 |
| Sep 1, 2026 | Alteration / Remodel (Residential) | Demolition & Site Preparation: Removal of old flooring, deck, bathroom combo, pressure washing (1,200 sqft), and installation of heavy site protection. Framing | Gaston County | $149,318 |
| Jul 30, 2026 | Single Trade (Residential) - Electrical | Adding a new circuit for dehumidifier in the crawlspace. | Gaston County | — |
| Jul 16, 2026 | Single Trade (Residential) - Electrical | Service meter riser storm damage. Replacing the riser and wire that was broke in the storm. | Gaston County | — |
| Jul 8, 2026 | HVAC Change Out - Gas | 1.5 ton AC/coil/furnace | Gaston County | — |
| Jun 23, 2026 | Single Trade (Residential) - Electrical | Service panel change out We will be changing out the older service panel for a new one. The old one is maxed out on breaker space, and we will replace it with o | Gaston County | — |
| Jun 23, 2026 | Single Trade (Residential) - Electrical | Service panel change out We will be replacing one of the two service panels. The panel needs more breaker space and the customer has ran out of breaker space. W | Gaston County | — |
| Jun 23, 2026 | Single Trade (Residential) - Electrical | This is for an underground trench feeder to a building. This will have a feeder wire in conduit going to the building. | Gaston County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed8
- Issued6
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.