Contractor · Electrical

Z&K Electric LLC

14 building permits since 2025 in Gaston County, NC — $497,798 in reported job value over 6 permits that state one.

Building permits
14
Reported job value
$497.8K
Active
2025–2026
Latest permit
Oct 16, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Gaston County, NC14

Permits by year

By issue date (application date where there is none).

0510
9
20252026*
* 2026 is year to date.
View as table
YearPermits
20255
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical10
  • HVAC4
  • Remodels4
  • Bathrooms4
  • Gas3
  • Electric meters3
  • Kitchens2
  • Plumbing2
  • Roofing1
  • Additions1

Permit types

As the building departments classify them.

  • Single Trade (Residential) - Electrical7
  • Alteration / Remodel (Residential)4
  • Addition (Residential)1
  • HVAC Changeout - Commercial Structure1
  • HVAC Change Out - Gas1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 16, 2026Addition (Residential)This project is a comprehensive multi-room addition to an existing home, consisting of a new double-car garage, a master bedroom and bathroom suite, a bonus rooGaston County$204,479
Sep 1, 2026Alteration / Remodel (Residential)Demolition & Site Preparation: Removal of old flooring, deck, bathroom combo, pressure washing (1,200 sqft), and installation of heavy site protection. Framing Gaston County$149,318
Jul 30, 2026Single Trade (Residential) - ElectricalAdding a new circuit for dehumidifier in the crawlspace.Gaston County—
Jul 16, 2026Single Trade (Residential) - ElectricalService meter riser storm damage. Replacing the riser and wire that was broke in the storm.Gaston County—
Jul 8, 2026HVAC Change Out - Gas1.5 ton AC/coil/furnaceGaston County—
Jun 23, 2026Single Trade (Residential) - ElectricalService panel change out We will be changing out the older service panel for a new one. The old one is maxed out on breaker space, and we will replace it with oGaston County—
Jun 23, 2026Single Trade (Residential) - ElectricalService panel change out We will be replacing one of the two service panels. The panel needs more breaker space and the customer has ran out of breaker space. WGaston County—
Jun 23, 2026Single Trade (Residential) - ElectricalThis is for an underground trench feeder to a building. This will have a feeder wire in conduit going to the building.Gaston County—

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Issued6

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.