Contractor · Plumbing
WTCPUA - Reuben Ramirez
14 building permits since 2018 in Travis County, TX.
- Building permits
- 14
- Reported job value
- —
- Active
- 2018–2022
- Latest permit
- Mar 30, 2022
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Travis County, TX14
Permits by year
By issue date (application date where there is none).
036
6
20182019202020212022
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 1 |
| 2019 | 2 |
| 2020 | 4 |
| 2021 | 6 |
| 2022 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing6
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Utility Permit14
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 30, 2022 | Utility Permit | WTCPUA Operations will bore under ROW of Hamilton Pool Road to install 1" service line and meter from existing 6" pvc watermain. | Travis County | — |
| Sep 15, 2021 | Utility Permit | WTCPUA proposes to bore under the Rim Rock Trail ROW to install new 1" service tap and water meter. Connection will be made to an existing 2" water main. | Travis County | — |
| Jul 16, 2021 | Utility Permit | WTCPUA proposes to bore under the Sharl Cove ROW to install new 1" service tap and water meter. Connection will be made to an existing 2" water main. | Travis County | — |
| Feb 22, 2021 | Utility Permit | WTCPUA will bore under Oak Valley Trail to install new water service line. Service will tie into existing 6" water main on north side of Weir Loop Circle. | Travis County | — |
| Feb 22, 2021 | Utility Permit | WTCPUA will bore under Flintrock Circle to install new water service line. Service will tie into existing 6" water main on north side of Weir Loop Circle. | Travis County | — |
| Feb 5, 2021 | Utility Permit | WTCPUA will bore under Midmorning Drive to install new water service line. Service will tie into existing 6" water main on north side of Weir Loop Circle. | Travis County | — |
| Jan 22, 2021 | Utility Permit | WTCPUA will bore under Weir Loop Circle to install new water service line. Service will tie into existing 6" water main on north side of Weir Loop Circle. | Travis County | — |
| Sep 25, 2020 | Utility Permit | WTCPUA Operations will bore under Vikki Terrace to install 1" service line and 5/8" meter assembly off existing 4" PVC water main. | Travis County | — |
Permit status
Where its permits stand, as the departments report them.
- Issued12
- Closed2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.