Contractor · Plumbing

WTCPUA - Reuben Ramirez

14 building permits since 2018 in Travis County, TX.

Building permits
14
Reported job value
—
Active
2018–2022
Latest permit
Mar 30, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Travis County, TX14

Permits by year

By issue date (application date where there is none).

036
6
20182019202020212022
View as table
YearPermits
20181
20192
20204
20216
20221

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing6
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Utility Permit14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 30, 2022Utility PermitWTCPUA Operations will bore under ROW of Hamilton Pool Road to install 1" service line and meter from existing 6" pvc watermain.Travis County—
Sep 15, 2021Utility PermitWTCPUA proposes to bore under the Rim Rock Trail ROW to install new 1" service tap and water meter. Connection will be made to an existing 2" water main.Travis County—
Jul 16, 2021Utility PermitWTCPUA proposes to bore under the Sharl Cove ROW to install new 1" service tap and water meter. Connection will be made to an existing 2" water main.Travis County—
Feb 22, 2021Utility PermitWTCPUA will bore under Oak Valley Trail to install new water service line. Service will tie into existing 6" water main on north side of Weir Loop Circle.Travis County—
Feb 22, 2021Utility PermitWTCPUA will bore under Flintrock Circle to install new water service line. Service will tie into existing 6" water main on north side of Weir Loop Circle.Travis County—
Feb 5, 2021Utility PermitWTCPUA will bore under Midmorning Drive to install new water service line. Service will tie into existing 6" water main on north side of Weir Loop Circle.Travis County—
Jan 22, 2021Utility PermitWTCPUA will bore under Weir Loop Circle to install new water service line. Service will tie into existing 6" water main on north side of Weir Loop Circle.Travis County—
Sep 25, 2020Utility PermitWTCPUA Operations will bore under Vikki Terrace to install 1" service line and 5/8" meter assembly off existing 4" PVC water main.Travis County—

Permit status

Where its permits stand, as the departments report them.

  • Issued12
  • Closed2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.