Contractor · General building

WADE MICHAEL ROBERT & LOREEN K LYONS

14 building permits since 2015 in Santa Cruz County, CA.

Building permits
14
Reported job value
—
Active
2015–2026
Latest permit
Aug 19, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA14

Permits by year

By issue date (application date where there is none).

02.55
5
201520172021202220232026*
* 2026 is year to date.
View as table
YearPermits
20151
20171
20212
20225
20234
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms9
  • Kitchens8
  • Roofing5
  • Plumbing3
  • Remodels2
  • Accessory dwelling units1
  • Solar1
  • Windows & doors1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Building14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 19, 2026BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure >600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—
Dec 6, 2023Building518 sq. ft. 2 bed/1 bath ADU converted from an existing structure at building #4. Work to include new roof on full 670 sq. ft. building #4. On site with multi uSanta Cruz County—
Jul 31, 2023BuildingWork to be done at Unit #20. Replace kitchen sink and cabinets. Replace tub, tile surrounding tub, valve, vanity and faucets. Install or verify listed smoke detSanta Cruz County—
Jun 9, 2023BuildingRemove and replace existing kitchen cabinets. Remove and replace existing bathroom vanity and shower. FOR UNIT #6 Install or verify listed smoke detectors and cSanta Cruz County—
May 15, 2023BuildingRemove and Replace existing kitchen cabinets. Remove and Replace existing bathtub and vanity. Work specified is for unit #7. Install or verify listed smoke deteSanta Cruz County—
Oct 19, 2022BuildingInterior remodel, NO structural changes at UNIT #14. Work to consist of: Kitchen & bath upgrade , new vanities, cabinets, and tub. Replace (3) windows like for Santa Cruz County—
Oct 19, 2022BuildingInterior remodel, NO structural changes at UNIT #9. Work to consist of: Kitchen & bath upgrade , new vanity, cabinets and countertops at existing SFD. Install lSanta Cruz County—
Sep 15, 2022BuildingCentral FPD/LRA Tear off roofing at an existing DUPLEX unit ( 950 & 952) and install new sheathing if required and class B or better (comp) roofing 25sq's . InsSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed13
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.