Contractor · Electrical

Ted Hennigan

14 building permits since 2020 in Pender County, NC — $40,925 in reported job value over 8 permits that state one.

Building permits
14
Reported job value
$40.9K
Active
2020–2026
Latest permit
Mar 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Pender County, NC14

Permits by year

By issue date (application date where there is none).

036
6
202020212023202420252026*
* 2026 is year to date.
View as table
YearPermits
20206
20213
20231
20241
20252
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical14
  • Generators12
  • Electric meters1

Permit types

As the building departments classify them.

  • Residential Electrical Stand Alone Permit12
  • Commercial Electrical Stand Alone Permit2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 23, 2026Commercial Electrical Stand Alone PermitI will be installing two 200 amp meter combo units. Off from the meters will be power to two sub panels and receptacles on the new concrete dock.Pender County—
Nov 21, 2025Commercial Electrical Stand Alone PermitInstall a 200 amp service on the outside of the well pump house. Install a 100 sub panel inside of the pump house to feed the well pump, lights and receptacles.Pender County$1,100
Oct 31, 2025Residential Electrical Stand Alone PermitInstall a 26KW Generac home standby Generator. Transfer a switch was already in place..Pender County—
Apr 12, 2024Residential Electrical Stand Alone PermitInstalling a 26 KW automatic Generac generator with a 200 amp automatic transfer switchPender County—
Jul 13, 2023Residential Electrical Stand Alone PermitInstall a 24KW Generac generator and connect it to the existing transfer switchPender County—
Sep 1, 2021Residential Electrical Stand Alone PermitInstalling a 22 KW Generac generator with a 200 amp automatic transfer switchPender County$7,800
May 21, 2021Residential Electrical Stand Alone PermitInstall a 22 K.W Generac generator with a 200 amp automatic transfer switch.Pender County$7,775
May 21, 2021Residential Electrical Stand Alone PermitInstall a 22 K.W Generac generator with a 200 amp automatic transfer switchPender County$7,850

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Expired5
  • Void1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.