Contractor

STUMPYS DECK RENEWAL INC

14 building permits since 2016 in Minneapolis city, MN; Blaine city, MN and Lino Lakes city, MN, across 2 counties — $97,000 in reported job value over 10 permits that state one.

Building permits
14
Reported job value
$97K
Active
2016–2024
Latest permit
Dec 17, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Minneapolis city, MN10
  • Blaine city, MN3
  • Lino Lakes city, MN1

Permits by year

By issue date (application date where there is none).

02.55
5
2016201820222024
View as table
YearPermits
20162
20171
20181
20191
20221
20235
20243

Permit types

As the building departments classify them.

  • Res9
  • BLDG - Residential3
  • Building1
  • Commercial1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 17, 2024Res(DMH -ProjectDox) REPLACE EXISTING DECKING & POSTS WITH NEW CEDAR. EXISTING STRUCTURE TO REMAIN. NO PLAN. DECK POSTS SHALL BECONNECTED TO FOOTINGS PER 2020 IRC Minneapolis City$4,000
Dec 17, 2024ResREDECK EXISTING WOOD DECK WITH STEPS AND HANDRAIL USING CEDAR DECKINGS AND CEDAR FACING IN A SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN AND DOCUMENT) - INSTALL Minneapolis City$4,000
Dec 17, 2024ResRE-DECK EXISTING DECK. REBUILD STAIRS. REMAINING JOISTS AND FOOTINGS TO REMAIN. (JJL) CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDINMinneapolis City$5,000
Nov 16, 2023Res(DMH - ProjectDox) CONSTRUCT 23' X 8' TREATED WOOD DECK AT REAR SFD WITH STAIRS, HANDRAIL, AND 4 FOOTING LOCATIONS. DECK IS LESS THAN 30" ABOVE GRADE. THE 2020 Minneapolis City$20,000
Jun 13, 2023Resre-build deck using existing footings and ledgerMinneapolis City$14,000
Apr 13, 2023ResREAR WOOD DECK REPAIR WORK OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN AND DOCUMENT). - RE-DECK EXISTING REAR WOOD DECK TO INCLUDE REPLACING CEDAR DEMinneapolis City$10,000
Feb 17, 2023CommercialALTS TO EXISTING DECK REPLACE STEPS AND HAND/GUARD RAIL. HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE Minneapolis City$6,000
Jan 13, 2023ResRemove and replace decking with new composite decking on existing framing to remain. New hand and guard railingMinneapolis City$10,000

Permit status

Where its permits stand, as the departments report them.

  • Closed8
  • Finaled4
  • Active1
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.