Contractor
STUMPYS DECK RENEWAL INC
14 building permits since 2016 in Minneapolis city, MN; Blaine city, MN and Lino Lakes city, MN, across 2 counties — $97,000 in reported job value over 10 permits that state one.
- Building permits
- 14
- Reported job value
- $97K
- Active
- 2016–2024
- Latest permit
- Dec 17, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN10
- Blaine city, MN3
- Lino Lakes city, MN1
Permits by year
By issue date (application date where there is none).
02.55
5
2016201820222024
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 2 |
| 2017 | 1 |
| 2018 | 1 |
| 2019 | 1 |
| 2022 | 1 |
| 2023 | 5 |
| 2024 | 3 |
Permit types
As the building departments classify them.
- Res9
- BLDG - Residential3
- Building1
- Commercial1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 17, 2024 | Res | (DMH -ProjectDox) REPLACE EXISTING DECKING & POSTS WITH NEW CEDAR. EXISTING STRUCTURE TO REMAIN. NO PLAN. DECK POSTS SHALL BECONNECTED TO FOOTINGS PER 2020 IRC | Minneapolis City | $4,000 |
| Dec 17, 2024 | Res | REDECK EXISTING WOOD DECK WITH STEPS AND HANDRAIL USING CEDAR DECKINGS AND CEDAR FACING IN A SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN AND DOCUMENT) - INSTALL | Minneapolis City | $4,000 |
| Dec 17, 2024 | Res | RE-DECK EXISTING DECK. REBUILD STAIRS. REMAINING JOISTS AND FOOTINGS TO REMAIN. (JJL) CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDIN | Minneapolis City | $5,000 |
| Nov 16, 2023 | Res | (DMH - ProjectDox) CONSTRUCT 23' X 8' TREATED WOOD DECK AT REAR SFD WITH STAIRS, HANDRAIL, AND 4 FOOTING LOCATIONS. DECK IS LESS THAN 30" ABOVE GRADE. THE 2020 | Minneapolis City | $20,000 |
| Jun 13, 2023 | Res | re-build deck using existing footings and ledger | Minneapolis City | $14,000 |
| Apr 13, 2023 | Res | REAR WOOD DECK REPAIR WORK OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN AND DOCUMENT). - RE-DECK EXISTING REAR WOOD DECK TO INCLUDE REPLACING CEDAR DE | Minneapolis City | $10,000 |
| Feb 17, 2023 | Commercial | ALTS TO EXISTING DECK REPLACE STEPS AND HAND/GUARD RAIL. HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE | Minneapolis City | $6,000 |
| Jan 13, 2023 | Res | Remove and replace decking with new composite decking on existing framing to remain. New hand and guard railing | Minneapolis City | $10,000 |
Permit status
Where its permits stand, as the departments report them.
- Closed8
- Finaled4
- Active1
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.